Loading…
Loading…
6,711 results • Latest
Emergent maintenance of Chandannagar Sub-Divisional Hospital Main Building, Chandannagar under Hooghly Sub- Division No.-II, P.W.D. of Hooghly Division, P.W.D during the year 2025-26 R and B Works
Repairing work of Jangalpara Gangadharpur Road from 0.00 kmp to 3.50 km (In Stretches) of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II, in the district of Hooghly during the year 2026-27
SITC IP Media Gateway with 64 analog extension and necessary hardware and software to interconnect with the existing IPPABX system at Arambagh Medical College
Repairing work of Bandhpur-Ichapasara Road from 0.00 kmp to 3.00 km In Stretches of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II in the district of Hooghly during the year 2026-27.
Construction of Concrete road from Arakul bridge to Simultala
Restoration of blacktop surface by 80 mm thick concrete paver block in the distressed zone of Kamarkundu ROB Service road L S Tarakeswar End of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II, in the district of Hooghl
Emergent work on Speed breakers on GT Road SH-13 from Ch. 610.50 km to Ch. 611.10 km under Hooghly Highway Division No.-II, P.W. Roads Directrorate during the year 2026-27.
Emergent patch repairing work from 0.770 Km to 3.70 Km of Chandannagar Nasibpur Road of Chandannagar Highway Sub-Division under Hooghly Highway Division II,P.W(Roads) Dte in the district of Hooghly during the year 2026-2027
Repairing of road surface from 0.00 km to 1.73 km in streches of Khanyan Tamba Road in the district of Hooghly under Bansberia Highway Sub Division-II,Hooghly Highway Division-II,P.W(roads)Dte. during the year 2026-27.
CONSTRUCTION OF CONCRETE ROAD STARTING FROM H/O MITHUN KONER TO H/O DR.KAJOL MONDAL TO H/O KALLYAN BANDHOPADHAY TO H/O SHYAMAL MAITRY AT PRANTIKPALLY IN WARD NO.-13, UNDER ARAMBAGH MUNICIPALITY,ARAMBAGH,HOOGHLY.
CONSTRUCTION OF DRAIN FROM HO RUNU KHARATI TOWARDS HO KHOKAN DAS AT SANSAD NO XXVIII UNDER KODALIA-1 GP
Repairing work of Dankuni ROB Service Road fom 0.00 km to 0.500 km under Serampore Bridge Highway Sub-Division of Hooghly Highway Division No-II in the Distrct of Hooghly during the year 2026-27.
Repair and Re-habilitation of Minor Bridge at Ch. 2.30 km of Narayanpur on Tarakeswar-Dashghara Road to Jiara Ferry Ghat under Hooghly Construction Sub-Division-III, PWD under Hooghly Construction Division, P.W.D. during the year 2025-2026.
CONSTRUCTION OF A CC ROAD FROM HO MAHADEV SARKAR TO HO SUKUMAR MONDAL AT SANSAD NO XIII UNDER KODALIA-1 GP
Surfacing work of Kamarkundu R.O.B service Road from 13.0 km BTC Road In stretches in Serampore Bridge Highway sub division under Hooghly Highway Divn oin the district of Hooghly, P.W.Roads Directorate, during the year 2026-27.
Supply rate of different materials to be used in different works under VB-G RAM G Scheme for PALASPAI-II GP
Supply rate of different materials to be used in different works under VB-G RAM G Scheme for MAROKHANA GP
CONSTRUCTION OF PCC ROAD FROM H/O MANIK SANTRA TO H/O NASIMA KHATUN AT BAHIRKHANDA (BOOTH NO. 95) UNDER NARAYANPUR BAHIRKHAND G.P. WITHIN HARIPAL BLOCK.
Supply rate of different materials to be used in different works under VB-G RAM G Scheme for PALASPAI-I GP
Potholes and Patch Repairs of concrete road from Sahapur Primary School to Damodar Bundh under Bhangamora G.P. within Pursurah P.S in the District of Hooghly.
Potholes and Patch Repairs of Concrete road from Boropol aniya to Partha Bari Gopalpur Gurpara under Aniya G.P. within Chanditala - I P.S. in the District of Hooghly.
Supply and operating diesel electric 12 twelve nos pump outlet 4 and capacity 2HP for emergency urgent basis under Chandernagore Municipal Corporation including Fuel Carring and Operator including all taxes
Annual comprehensive servicing and preventive maintenance of Split, Ductable Concealed Split type Air Conditioning machines installed at Chandannagar S.D.O office building and Bungalow and Chandannagar Sub Divisional Court Child Friendly POCSO
Renovation to the EI Work incl. special repairing to the compound lighting of Inspection Bungalow at Arambagh Highway Sub-Division, P.W. Roads Dte. in the district of Hooghly.
Annual Comprehensive Servicing and Preventive Maintenance of Split and concealed Split type Air-conditioning units and 2 nos 7.5 TR capacity 12 body Mortuary Cooler installed at Serampore Walsh SD Hospital under Serampore Electrical Sub Division
Annual Comprehensive Servicing and Preventive Mtc of Split and Ductable type concealed Split type AC units installed at Serampore Sub Divisional Court, DLSA Building and Office of the Joint Commissioner, Commercial Taxes, Serampore
Providing Thermoplastic Road Marking Paint on both sides of road table tops at different locations along the Chanditala Seakhala Champadanga Road under Serampore Highway Sub-Division Hooghly Highway Division No I during the year 2026-27.
Annual Comprehensive Servicing and Preventive Maintenance of Split and Ductable type concealed Split type Air-conditioning units installed at Uttarpara SG Hospital under Serampore Electrical Sub Division in the District of Hooghly
SITC of Air conditioning machines with allied electrical work at Government College of Nursing, Serampore Walsh SD/SS Hospital, Serampore, Hooghly
Engagement of Operation and Maintenance personnel at Sreerampur Sewage Treatment Plant, Hooghly for the period from 01.10.2026 to 30.09.2027 (2nd Call).
Annual comprehensive servicing and preventive maintenance of Split, Ductable Concealed Split type Air Conditioning machines installed at Chandannagar Sub- Divisional Hospital under Chandannagar Electrical Section I , P.W.D.
One time thorough cleaning including drainage system of Uttarpara S.G.H. Premises and Quarter premises under Serampore Sub Division, PWD during the year 2026-27 (2nd call).
Temporary patch repair works to the stretches from 17.80 kmp chainage to 18.90 kmp chainage of Chanditala Salkia Road under Serampore Sub Division, Hooghly Division PWD during the year 2026-27 (2nd call).
Construction of new drain in front of Chatra Shiv Mondir on G.T. road Ch. 658.75kmp at Serampore for effective drainage of accumulated surface and rainwater under Serampore Sub Division, PWD during the year 2026-2027 (2nd call).
Cleaning of bushes, shurbs and accumulated debris from Gopalnagar Mouza under Singur Block under Hooghly Division, PWD during the year 2026 - 2027.
Repairing of Bituminous Road from D.V.C. Lock Gate towards Das Pukur via Tangra, within Purba Ramnagar G.P. under Tarakeswar Block in the District of Hooghly.
Cleaning of bushes, shurbs and accumulated debris from Bajemelia Mouza under Singur Block under Hooghly Division, PWD during the year 2026 - 2027.
Repairing of CC Road from Ghoshpur Ground towards Sarampur DVC Bridge at Dantra within Goswami Malipara G.P. under Polba-Dadpur Block in the District of Hooghly.
Repairing of Bituminous Road from Nasibpur Khaldhar to Telipukur More at Singur Block in the District of Hooghly.
Periodical maintenance of CT Scan building, Isolation Ward Building and HCCU Building under Imambara District Hospital Campus at Chinsurah in the district of Hooghly under Hooghly Division P.W.D. during the year 2026_ 2027.
REPAIRING WORKS OF PCC ROAD FROM GOKUL GERE POND TO UDAY GHOSH HOUSE UNDER BATANAL GP
REPAIRS WORKS OF BOULDER MOORUM ROAD FROM NIRMAL RAY HOUSE TO PANCHU PATRA HOUSE UNDER BATANAL GP
REPAIR OF PCC ROAD FROM UTTAR RASULPUR PAKAPUL TO BAJAR PAR UNDER BATANAL GP
INSTALLATION OF SOLAR SUBMERSIBLE PUMP AT MORAL PARA UNDER BATANAL GP
Street Light at Electric Poll, ( 11 NOs ) PS 62 UNDDER BANDIPUR GP WITHIN HARIPAL DEVELOPMENT BLOCK
Installation of Mini High Mast Light at Mohistikari Bag Para PS- 38 under Chandanpur GP within Haripal Block
Installation of Mini High Mast Light at Mohistikari Malik Para Bottala PS-38 under Chandanpur GP within Haripal Block
Installation of 30 nos Street Light under Kangoi sansad PS- 36 under Chandanpur GP within Haripal Block
Installation of Mini High Mast Light infront of Shibtala Mondir at Kuleba PS- 39 under Chandanpur GP within Haripal Dev.Block
CONSTRUCTION OF CONCRETE ROAD STARTING FROM PRADIP POREL HOUSE TO GOUTAM MALIK HOUSE THROUGH CHANCHAL MONDAL AND VOLA ALU HOUSE AT BERBARI IN WARD NO.-13, UNDER ARAMBAGH MUNICIPALITY,ARAMBAGH,HOOGHLY.P.S.ARAMBAGH.