Loading…
Loading…
1,927 results • Latest
Manpower Outsourcing Services - Minimum wage - Semi- skilled; High School; Others
IOH KIT FOR PRAG
Valve Assembly Inlet for ELGI Make Compressor type RR20100CG(M) for 3 Phase locomotives As per ELGI Part No.A070072
ELGI Make Valve Assembly, Discharge for ELGI Make compressor type RR20100CG(M) for 3 Phase locomotives As per ELGI part no-A070071.
Transparent Polythene Sht, 1.8x3mx125mic
S/R, MOW, Repairing work in R.B., N.R.Bldgs P.W.D. Sub Division Seoni Malwa (Section Seoni Malwa). 1st Call, PAC Rs. 19.85 Lacs on Building Works SOR 01.01.2024 (Ammendment upto date), Completion period 180 days i/c rainy season.
RB, NRB for W/W, C/W, Distempering under H.Q. 1, in PWD. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 19.88 Lacs on Building Works SOR 01.01.2024 (Ammendment upto date), Completion period 180 days i/c rainy season.
Repairing work in RB, NRB in Pipariya section under Pipariya Sub Division. 1st Call, PAC Rs. 19.93 Lacs on Building Works SOR 01.01.2024 (Ammendment upto date), Completion period 180 days i/c rainy season.
Repairing work of D,E and F Type Quarter in H.Q. No. 2 P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 19.13 Lacs on Building Works SOR 01.01.2024 (Ammendment upto date), Completion period 180 days i/c rainy season.
Repairing of Bridge, Culverts, Protection wall different road of Sub Dn. Seoni Malwa (Section Seoni Malwa). 1st Call, PAC Rs. 19.90 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Repairing of Bridge, Culverts, Protection wall different road of Sub Dn. Seoni Malwa (Section Dolariya). 1st Call, PAC Rs. 19.99 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Maintenance, Construction work under MP/MLA/Janbhagidari, other deposit work/Non Residential Buildings under P.W.D. Sub Division Pipariya. 1st Call, PAC Rs. 9.90 Lacs on Building Works SOR 01.01.2024 (Ammendment upto date), Completion period 120 days
Construction of Bhairopur to Chandon road, Length 1.50 Km. 1st Call, PAC Rs. 203.03 Lacs on Road Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 150 days i/c rainy season.
Construction of Bachawani to Andhian Babri road. 1st Call, PAC Rs. 260.88 Lacs on Road Bridge SOR 11.04.2025 (Ammendment upto date), Completion period 150 days i/c rainy season.
Construction of Fencing work of Plots RCC Pillar for Outer Boundary Demarcation of Area at Industrial Area Mohasa-Babai Phase-2 Distt Narmadapuram (M.P.)
Hiring of 01 no. inspection vehicle (A.C.) for handpumps , water supply schemes and other govt. works in rural areas under Superintending Engineer, Public Health Engineering Department, Narmadapuram Circle, Narmadapuram for one year
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Overhauling kit for MVER POV Port
Hose coupling
Set of spares for CVVRS
Repairing of Bridge, Culverts, Protection wall different road of Sub Dn. Seoni Malwa (Section Dhekna). 1st Call, PAC Rs. 19.95 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c rainy season.
Procurement of Anionic Polymer
RB, NRB for White Washing, Colour Washing, Distempering in Bankhedi Section under P.W.D. Sub Division, Pipariya. 1st Call, PAC Rs. 19.83 Lacs on Building Works SOR 01.01.2024 (Ammendment upto date), Completion period 180 days i/c rainy season.
S/R, MOW Repairing work in R.B., N.R.Bldgs P.W.D. Sub Division Seoni Malwa (Section Dolariya). 1st Call, PAC Rs. 19.85 Lacs on Building Works SOR 01.01.2024 (Ammend-ment upto date), Completion period 180 days i/c rainy season.
Repairing work in RB, NRB in Pachmarhi Sub Division. 1st Call, PAC Rs. 19.79 Lacs on Building Works SOR 01.01.2024 (Ammendment upto date), Completion period 180 days i/c rainy season.
Shoulder filling, Painting, Figuring on CD, J.C. Bridge etc. work on different roads under Sub Dn. Seoni Malwa, section Dolariya. 1st Call, PAC Rs. 19.96 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i/c
Shoulder filling, Painting, Figuring on CD, J.C. Bridge etc. work on different roads under Sub Dn. Seoni Malwa, section Seoni Malwa. 1st Call, PAC Rs. 19.31 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 120 days i
GROCERY ITEM
Purchase of Sand
Purchase of fencing
Supply, installation and commissioning of Air Dryer Test Bench
MINIMUM VOLTAGE RELAY (MVR)
Digital TORQUE WRENCH TESTER
Set of Thermoplastic Polyurethane Spring Pads
Aluminium Phosphide Formulation (V2) Conforming to IS 6438 (Q2) (3 (3 ))
AIR BREAK CONTACTORS 3POLE, 65AMP, 40AMP, AIR BREAK CONTACTORS 25AMP, RATING, AT 415 AC
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Admin
Set of items for repair of Traction converter Power modules
Motor sprit petrol to confirming IS: 2796/1971 with deviation/ relaxation authorised by Ministry of P&C from time to time. To be procured at depot. specn: IS 2796/1971 Make/Brand-HPCL
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Healthcare
HOSE FOR CAB HEATER
Hex Head Bolt, M12x30
Set of Sand box Locking Arrangement
PressTransOnCPressSens152-0-2mbar, Radar Level tx Non contact, Flowsensor Onc 604 PN40DN80
Construction of RCC Drain in Ward 27 Prajapati House to Bada Nala. (Fourth Call)
Construction of Two Side RCC Drain in Ward 20 From Puneet Malviya House to Subhas Chandra Bos School.
Construction of CC Road in Ward 16 From Dilip Baroniya House to Manoj Patwa House.
Construction of CC Road in Ward 16 From Sonasawri Naka Pani Ki Tanki to Dilip Banoriya House.