Loading…
Loading…
14,581 results • Latest
Supply of Poly Aluminium Chloride PAC FOOD GRADE HIGH BASICITY LIQUID FORM Specification should be as per BIS 15573 2018 For the period of One Year for round the clock operation as per requirement, specification direction of EIC for th
Service Charges for Providing 06 Nos. security personnel round the clock security services to different buildings and structures, store materials, electrical installations, office furniture etc. at WBIIDC Uluberia Industrial Park, Birshibpur Distri
Supply of Liquid Chlorine Conforming to IS 646 1986. For the period of One Year for round the clock operation as per requirement, specification direction of EIC
REPAIRING OF ROAD AT HALDARPARA MORE TO NETAJI SUBHAS ROAD (244, 245, 233/1/1, etc.) ALONG WITH OTHER ANCILLARY WORKS AT WARD 25, PS 175 UNDER HMC (Area 256.5 Sqm) Scheme ID APAS/01/171/175/0001 Defect Liability Period 05 Years
CONSTRUCTION OF NEW CEMENT CONCRETE ROAD AT 27 NIYADHAN MUKHERJEE ROD ALONG WITH OTHER ANCILLARY WORKS AT WARD 29, PS 110 UNDER HMC (Area 309.0 Sqm) Scheme ID APAS/01/171/110/0003 Defect Liability Period 05 Years
REPAIRING OF ROAD THOROUGHLY AT SARADA CHATTERJEE LANE (1 TO 19/1 , 50 TO 72 , ETC.) AND BY LANES ALONG WITH OTHER ANCILLARY WORKS AT WARD 23, PS 208 UNDER HMC(Area 256.50 Sqm) Scheme ID APAS/01/172/208/0003. Defect Liability Period 05 Years
REPAIRING OF ROAD AT KALACHAND NANDY LANE (50/1, 65/2, 70 to 75/1/1 etc) ALONG WITH OTHER ANCILLARY WORKS AT WARD 24, PS 77 UNDER HMC (Area 154.0 Sqm) Scheme ID APAS/01/171/77/0001. Defect Liability Period 05 Years
REPAIRING OF ROAD AT KALACHAND NANDY LANE (1 TO 10, 11 TO 16, 33 TO 33/19 , ETC.) AND BY LANES ALONG WITH OTHER ANCILLARY WORKS AT WARD 23, PS 205 UNDER HMC(Area 218.75 Sqm) Scheme ID APAS/01/172/206/0001. Defect Liability Period 05 Years
Digital Blood Pressure Monitor (Q2)
Circular Sheathedwith Rigid Conductor (V2) ISIMarked To IS694 (Q2)
Repairing of Road with allied works at Priyonath Ghosh Lane under HMC ward no-25, P.S No-178.(Area 257.5 Sqm) Scheme ID APAS/01/171/178/0003. Defect Liability Period 05 Years
Industrial Washer Cum Extractor 120 kg
Construction of cement concrete road from Swapan Mitra House to Biswanath Dutta House via Asim Deb House under Jagadispur G.P. within Bally Jagacha Panchyat Samity.
Repairing of Road with allied works at Narasingha Dutta Lane (120/4/1/3 to 123/4, etc) under HMC ward no-24, P.S No-78 (Area 316.3 Sqm) Scheme ID APAS/01/171/78/0003. Defect Liability Period 05 Years
Repair Construction of ICDS 74 no at Deorah Near Dakshin Deorah Prymary School
05. Construction of road from h/o Lalan Jadav to h/o Minati Manna (Part 25 )
03. Repairing of drain near Sardarpara boro pukur ( Part -16)
02. Repairing of road from h/o Shib Mandir to h/o Suvas Ganguli (Part 15 )
Emergent work of Colouring road side Kerb Stone via-ducts, cleaning etc around Nabanna and Nabanna Sabhaghar premises during the year 2026 27
01. Repairing of road from h/o Baban Parui to Chaina De (Part 15 )
Improvement of Cement Concrete Road 13/1 to 18/4 Brindabon Mullick Lane, 60/5 Kanta Pukur 3rd bye Lane to 87 Makardah Road, 11/1 to 13/1/1 Kantapukur 3rd bye Lane Ward 23.
Emergent work of Colouring common area inside Nabanna premises during the year 2026 27
04. Sinking of new PVC pipe made tube well near h/o Sushil Saha at Muzumderpara Khaldhar (Part 19)
Emergent protection work of both bank of Chardah Sluice for a length of 23.00 M in GP-Rashpur, Block -Amta-I, PS-Amta, Dist-Howrah
Emergent reconstruction of Bagerhana Wooden Bridge over Rajapur Branch Khal for a length of 13.20 m in GP-Panchla, Block and PS- Panchla, Dist-Howrah
Emergent restoration of Gazipur Dighirpar Wooden Bridge over Link Channel of Lower Rampur Khal in GP-Gazipur, Block- Amta - II, PS-Amta, Dist-Howrah
Emergent reconstruction of Gabberia Kajipara Wooden Bridge near Sekandars house over Rajapur Branch Khal Suti Khal for a length of 15.00 m in GP-Subhararh, Block- Panchla, PS-Panchla, Dist- Howrah
Improvement of Cement Concrete Road along 17 to 21 Beharilal das Pramanik Lane, 40 to 75/1/1 Kala Chand Nandy Lane, 2/2 to 40 Kailash Chandra Chandra lane Ward 24.
Emergent protection work at Left bank of River Damodar near Bagua High School in GP - Balichak, Block - Amta - I, PS-Amta, District-Howrah
Improvement of Cement Concrete Road 14/3 Bhagaban Chatterjee Lane to 117/1 Makardah Road and 7/1 Kedarnath Mukherjee Lane to 23 Laxminarayan Chakraborty Lane Ward 23.
Construction of Cement Concrete Road along Charu Chandra Singha Lane, Ramkrishnapur Lane, Kailash Bose Lane, Uma Charan Bhattacherjee Lane, Kailash Bose 4th Bye Lane Ward 28.
Construction of Cement Concrete Road along Gopal Banerjee 1st Bye Lane , 14 to 31 Anantaram Mukherjee Lane and 1 to 10 Kailash Bose 1st Bye Lane Ward 28.
Restoration of Slipes, erosions along the left embankment of river Rupnarayan at country side for a length of 50.00 mtr. near Shibpur Sana para Swasan due to rain fall and high tide of river Rupnarayan in GP-Baneswarpur-II, Block-Shyampur-I,Howrah
Improvement of Cement Concrete Road along 83/84/85 Narasingha Dutta Road to 41 Hem Chakraborty Lane, 19/2/25 Beharilal Das Pramanik Lane, 35/2 Hem Chakraborty Lane to 27/2 Hem Chakraborty Lane Ward 24.
Electronic Weighing Scales (Q2)
Construction of Cement Concrete Road along Amritalal Pyne Lane Ward 27.
Handloom Cotton Bed Sheets (V2) asper IS745 (Q2)
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Construction of Drain with Cover Slab from Santoshpur Berapara Kalitala to Bantul PHC Ground under Antila G.P. within Bagnan-II P. Samity
CONSTRUCTION OF PCC ROAD FROM PRABIR DAS HOUSE TO PULIN DAS HOUSE AT KHOLABERIA BOOTH NO 273 MOUZA-102 Scheme/ Project(s) Id. No APAS/01/179/273/0002
CONSTRUCTION OF PCC ROAD FROM DILIP SAHA HOUSE TO TAPAN PATRA HOUSE AT KHOLABERIA BOOTH NO 273 MOUZA-102 Scheme/ Project(s) Id. No APAS/01/179/273/0004
REPAIRING OF SCHOOL AT HIRAPUR SRIMANTA PRIMARY SCHOOL AT MOUZA-SARENGA, J.L. NO- OF SARENGA GRAM PANCHAYAT UNDER SANKRAIL PANCHAYAT SAMITY WITHIN DIST-HOWRAH UNDER SCHOOL EDUCATION DEPARTMENT FUND FOR THE FINANCIAL YEAR-2025-26
Permanent Road restoration due to laying of pipe (different dia.) Blacktop/ cement concrete at different wards of Uluberia Municipality under AMRUT . Zone ESR-5, SW-4..
Supply, delivery and installation of Three (03) no 15 HP submersible Pump motor set at Andul Rajbari, Dargatola Thana Road and Panchpra Govt. land P/H along with allied E-M works under FAWS-1 scheme.
Construction of one no.600cum capacity,20 mtr.staging height RCC Elevated Reservoir in terms with Departmental type design including pile foundation,delivery,inlet,outlet,overflow pipe connection all complete for Gobindapur W/S Scheme J.B.Pur Block