Loading…
Loading…
13,299 results • Latest
Link Road to Balichaturi via Ghoshpur Kalia, from 0.00 Km to 2.50 Km, Surfacing Work under Howrah Highway Division in the District of Howrah
CONSTRUCTION OF PCC ROAD FROM GROUND OF ANJUMAN TO GATE OF DELTA MILL BURIAL (APPROX-300 FT) UNDER MANICKPUR GP WITHIN SANKRAIL DEVELOPMENT BLOCK UNDER THE FUND APAS-2025 ,PART NO-243 ,Scheme ID. (APAS/01/174/243/0002)
Pallet Truck (V3) (Q2)
CONSTRUCTION OF A GATE AND THE BOUNDARY WALL AROUND THE KANDUA KHAN PARA JAME MASJID ATTACHED GRAVEYARD, AT MOUZA-KANDUA, J.L. NO- 5, PLOT NO-105, UNDER SANKRAIL DEVELOPMENT BLOCK DIST.-HOWRAH, UNDER- MINORITY AFFAIRS AND MADRASAH EDUCATION DEPARTME
CCTV Network Video Recorder
PAINT SYNTHETIC ENAMEL INTERIOR FINISHING
FITTING STRAIGHT CONNECTOR 8MM
Hex. Pipe nut thread size G 1/2
CONSTRUCTION OF ROAD AT WARD NO-32 WITHIN HOWRAH MUNICIPAL CORPORATION, (List of 04 nos of road are attached in Annexure-I)
Flanged wheel for H-Traverser
Main control unit - PCBA EWE - 042 [V4] 4.5KW - make "waves"
Multi Stranded flexible PVC copper wire
Lifting cylinder set, ACE
Electrical work for Laundry Building-Santragachi.
Set of Complete Hardware & Bush pin of 1 Coach Set of Economy Seats of Vande Bharat Train set. No of seats/coach: 78 (MC Coach), As per Annesure-A Firm's Offer : Make/Brand - SELF
Set of Complete Hardware & Bush pin of 1 Coach Set of Economy Seats of Vande Bharat Train set. No of seats/coach:78, (TC Coach) Firm's Offer : Make/Brand - SELF
JSF Polyurethane Coated Gloves 12 Brand: JSF (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687762778502 dt.22/06/2026)
Construction of Kitchen and sitting area for Mid Day Meal at Maheshpur ferry ghat Prathamik Vidyalaya
Construction of Water ATM at Pargana Deulpur High School at Deulpur GP under Panchla Panchayat Samity
A. Installation of 50 nos. LED street light in all electric post at Khorda Itarai 91 no. booth area. B. Installation of High Mast Light at Khorda Itarai Das Para Samsan. AT BOOTH NO 91
A. Construction of CC Road ( 300 ft.x 4 ft. ) from Pancharul Uttar Bandh Banshi Malik House to Prafulla Samanta House. B. Construction of CC Road ( 150 ft.x 4 ft. ) from Khorda Itarai Subrata Samanta House to Ashta Samanta House. C. Construction of C
Installation of High Mast Light at Itarai Paschim Para Samsan. AT BOOTH NO 92
A. Construction of CC Road ( 100 ft.x 4 ft. ) from Itarai Manasatala Nimtala to Sukumar Polley House. B. Construction of CC Road ( 200 ft.x 5 ft. ) from Itarai Ashta Mondal House to Arun Koley House. C. Construction of CC Road ( 300 ft.x 4 ft. ) from
A. Construction 510 ft. (approx) of CC road from Sushil Ghorui house to Haripada Sasmal house (via Raju Malik and Raju Maity house) at Uttar Harishpur. B. Construction 130 ft. (approx) of CC road from Somnath Majhi Shop to Sukamal Gure house at Uttar
Installation of 52 nos. LED street light at all area of Uttar Harishpur 98 no. booth.
A. Construction of CC Shed at Pancharul Jagannathtala(approx.1 th part ) B. Renovation of Pancharul Bhupaticharan Pariskarmayee Primary School. C. Construction of Culvert ( 12x8 ft. ) on the road from Pancharul Malik Para to Keshab Pollyes gola at P
Sinking of submersible with overhead tank near Shitalamata Pallikalyan Samiti at Pancharul. AT BOOTH NO 101
Construction of Burning Ghat shed ner Jagarampur Sing para under Joargori GP
Installation and repair of 70 nos. (approx) LED street light at Pancharul 101 no. booth.
A. Construction of 150 ft. (approx) CC road from Rabin Majhi house to Gopinath Koley house at Pancharul. B. Construction of 30 ft. x 20ft. Chatal at Pancharul Pirtala ICDS centre. C. Construction of 150 ft. (approx) CC road from Satya Chowli house to
Installation of 20 nos. Street light at Uttar Harishpur 104 no. Booth in existing light post.
Sinking of Sub Mersible Pump with Overhead tank at Uttar Harishpur Ray Para Santra Para. AT BOOTH NO 104
Construction of Concrete Road from house of Bansi Mondal to house of Kartick Bodok under Joargori GP
A. Construction of Yatri Shed at Uttar harishpur Dakshin Para beside ICDS Centre. B. Repairing of Floor slab at Uttar Harishpur Dakshin Para ICDS. C. Construction of Drainage Culvert at Uttar Harishpur Malik para Swapan Malik Daha Gora. D. Construc
Installation of 30 nos. LED street light at Ramsaranchak 107 no. booth.
A. Construction of drain at Ramsaranchak ICDS centre. B. Construction of Aqua Ghat at Ramsaranchak Samsan (10 ft. x 6 ft.). C. Construction of 70 ft. (approx) CC road from Amar Manna house to Durgamandir at Ramsaranchak Maitypara. D. Repair of 1000 f
A. Construction of CC road from Kumarpur Mrityunjoy pal House to Adwitya pal House ( Approx 300 ft. ) B. Construction of CC road from kumarpur Pal para Sricharan Pal House to Gopal Nayek House ( Approx 200 ft. ) C. Construction of CC road from Kumarp
Construction of Concrete Road from PWD road house of Ashok Mondal to Ashram under Joargori GP
Construction of Concrete Road from house of Dipak Ghosh to House of Anchitya Kanji under Joargori GP
CONSTRUCTION OF ROAD AT WARD NO-25 WITHIN ULUBERIA MUNICIPALITY
Construction of PCC Road From Tapan Mals Shop To Himangshu Ghosh House under Joargori GP
Installation of Tube Well Near Dipak Ghoshs house under Joargori GP
Weightand High Cranking Performance (V2) Conformingto IS14257 (Q3)
Polyurethane Coated Gloves (Q3)
Construction of Pucca Drain from house of Sanjay Santra to Battala Primary School. Fund-APAS,Work ID-APAS/01/174/164/0007