Loading…
Loading…
13,299 results • Latest
CONSTRUCTION OF DRAIN FROM GOUTAM GHOSH HOUSE TO TOKANER KHAL UNDER PANTIHAL GP WITHIN JBPUR PANCHAYAT SAMITY
CONSTRUCTION OF DRAIN AT BANKUL MAJAR DHAR FROM SK BARIK HOUSE TO HOUSE OF SK MOIDUL UNDER JBPUR-I GP WITHIN JBPUR PANCHAYAT SAMITY
CONSTRUCTION OF PUCCA DRAIN FROM HOUSE OF TUHIN MALLICK TO TARUN SANGHA CLUB UNDER JBPUR-I GP WITHIN JBPUR PANCHAYAT SAMITY
CONSTRUCTION OF DRAIN AT ICHANAGARI FROM ICHANAGARI DOKANTOLA TO HOUSE OF YOUNIS UNDER JBPUR-I GP WITHIN JBUR PANCHAYAT SAMITY
CONSTRUCTION OF CONCRETE ROAD FROM HOUSE OF ANANDI SARKAR TO PUKURPAR HOUSE AT KARBELA AT MOUZA-DHULAGORI, GP-DHULAGORI, BOOTH NO-130 UNDER SANKRAIL DEVELOPMENT BLOCK UNDER ASAP-25-26
CONSTRUCTION OF DRAIN WITH COVER AT BHURSHIT BRAHMANPARA FROM KOHINUR CLUB TO RESERVOUR UNDER SANKARHATI-I GP
ANME Type Nozzle for 3-Pipe Oxy-cutting
Surgical Cotton Wool I.P., Minimum 400 gm Pack.
REPAIRING OF BORO BOHARIA AWC-19341110919
Repairing and renovation of drain from 9/2, Olabibitaa Lane to Hazarhat Kali Mandir including cross drain cover slab, under Ward No.-33 , APAS Fund Defect Liability Period 01 Year.
Construction And Renovation of of drain with cover slab from 742, Sarat Chatterjee Road to Chatterjeehat Bazar More under ward no.-33, APAS Fund Defect Liability Period 01 Year.
DaytoDay Operation and Preventive Maintenance of Sound System at State Secretariat Office Nabanna,14th floor,12th floor,13th floor,8th floor Conference Hall, Groundfloor Press Conference Hall,Sabhaghar Press Room under KIT Div P.W.Dte. for 01 Year
Construction And Renovation of of drain with cover slab from HALDER PARA MORE TO 245, NETAJI SUBHAS ROAD 220, NETAJI SUBHAS ROAD TO 231 NETAJI SUBHAS ROAD under ward no.-25, APAS Fund Defect Liability Period 01 Year.
Construction And Renovation of of drain with cover slab from 10 Rajballav Saha Lane towards Kailas Bose 2nd By Lane under ward no.-28, APAS Fund Defect Liability Period 01 Year.
Repairing and renovation of drain with cover slab opposite to 43, Kashinath Chatterjee Lane, under ward no.-33, APAS Fund Defect Liability Period 01 Year.
Construction And Renovation of of drain with cover slab from 1/1 ANANTARAM MUKHERJEE LANE to 13 ANANTARAM MUKHERJEE LANE, under ward no.-28 ,APAS Fund Sch Id No.- APAS/01/171/157/0004 Defect Liability Period 01 Year
1) Digital three point internal micrometer, Range 175-200 mm, Accuracy: (+or-) 15 microns, Resolution 0.001 mm, with or without pistol grip, Extension Rod: 150 mm, Setting Ring of 175 mm included. Make: MITUTOYO, PRECISION, BAKERS, MAHR ONLY. 2) Digital three point internal micrometer, Range 225-250 mm, Accuracy: (+or-) 15 microns, Resolution 0.001 mm, with or without pistol grip, Extension Rod: 150 mm, Setting Ring of 225 mm included. Make: MITUTOYO, PRECISION, BAKERS, MAHR ONLY. 3) Digital three point internal micrometer, Range 275-300 mm, Accuracy: (+or-) 15 microns, Resolution 0.001 mm, with or without pistol grip, Extension Rod: 150 mm, Setting Ring of 275 mm included. Make: MITUTOYO, PRECISION, BAKERS, MAHR ONLY.
Supply of Brake Module part no. FP750-046/5
Control Panel CPU Card as per part no. JK-FDSS-1240
SET OF MATERIAL REQUIRED FOR REPLACEMENT [SET OF MATERIAL REQUIRED FOR REPLACEMENT OF ALUMINIUM WINDOW BARS AND WINDOW SUPPORT (4) SCREWS, SIZE-M5X30, ITEM NO-15, QTY-08 NOS.]
1) LASER WELDING MACHINE AS PER SPECIFICATI [LASER WELDING MACHINE 2) Post warranty comprehensive annual mai [ Post warranty comprehensive annual maintenance contract (CAMC) for a period of 05 years.]
Supply and fitment of Polycarbonate Sheet.
Locking plate of chain assembly,Pin dia 20X25 mm
Amit make HVAC spare CO2 Sensor
Amit make HVAC spare UV Lamp with Driver for VB trainset 32 nos
Supply & Installation of items for partial closing of toilet window using SS shet as per CAI no. A-2023/12 (Sl. No.-5, modification Remarks no.1) Firm's Offer : Make/Brand - JKST
Speed sensor connector Assy Drawing No. : Part No. FT 0053910-100. Material & specification As per Firms Part No. / Drg. No
FIABLE Cables 2 Core 1.5 sq. mm PVC Copper Circular Sheathed Cable with Rigid Conductor Brand: FIABLE Cables (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-51168779325
Axle end cover to FIAT-Sig SCHIENENFAHRZEUGE Ag s Drg. No.1268835, version-01R and Technical Specn. No.17.334 100 06/110 01 with amendment No.1 of March 2005 ,SG 400/15L IS:1865,MDTS-166,Rev-02 Firm's
New laying of 350mm dia. DI Pipe by replacing old damaged 350 mm dia backwashing C.I. Pipe from Clear Water Reservoir (CWR) to gate of filtration unit at Howrah Water Works Padmapukur Plant ( HWWPP)
Entry and Mid Level Laptop - Notebook (Q2)
Antivirus Software (Q2)
117701045_Panchayat Samity Pipeline Water System and Toilet and other constructions (Phase-II)
A. Installation of mini high mast light at Nimdangi Muslimpara Pirtala. B. Installation of 35 nos. LED street light at Nimdangi 110 no. booth area. AT BOOTH NO 110
A. Constrcution of Culvert in between Nimdangi and Purash Jora bandh main road. B. Construction of tin shade (30 ft. x 15 ft.) at Nimdangi Baroari tala Kalitala. C. Construction of 70 ft. Concrete boundary wall at Nimdangi ICDS centre. AT BOOTH NO 11
Sinking of Tube well at Shibnarayanchak Paschimpara Santra para. AT BOOTH NO 111
Installation of 50 nos. LED street Light at Shibnarayanchak 111 no. booth area.
A. Construction of Tin Shade without Chatal at Shibnarayanchak Baroyari tala (40 ft. x 25 ft.). B. Construction of 100 ft. CC road with Pilling from Nepal Bera house to Prabir Kunti house at Shibnarayanchak. C. Construction of 200 ft. Brick flat road
A. Construction of 150 ft. CC road and 50 ft. pilling from Shibnarayanchak Main road to Astam Singh house. B. Construction of 100 ft. CC road with Bricks from Robin Bag house to Haradhan Bag house at Shibnarayanchak. C. Construction of 150 ft. CC roa
Installation of Low mast light and LED street light on 120 nos. electric post at Shibnarayanchak Bera Para Mandir. AT BOOTH NO 115
A. Construction of 150 ft. (approx) Tally Piling in pond in front of Arun Chakraborty house at Boruipur. B. Construction of 50 ft. (approx) Tally Piling in pond in front of Ramchandra Dhara house at Boruipur. C. Construction of 150 ft. (approx) Tally
A. Construction of 100 ft. (approx) Tally Piling in front of Khila Ajit Dey house. B. Construction of 100 ft. (approx) Puccha drain from Asit Dey house to Panchanan Mandir at Khila. C. Construction of Tin shed (10 ft. BY 12 ft.) for public in Khila D
Sinking of Submersible pump with overhead tank in front of Khila Shitala Mandir. AT BOOTH NO 119
A. Construction of 100 ft. (approx) Tally Piling at the pond of Khila Dhara Para. B. Construction of Waiting Shed (Tin) (20 ft. x 20 ft.) at Khila Ananda Ashram Samsan. C. Construction of 150 ft. (approx) Tally Piling and Bathing ghat at the pond nea
Sinking of 1 no. Submersible pump at Khila Patra para Durgamandir. AT BOOTH NO 120
INSTALLATION OF 10NOS. SOLAR LIGHT AT PS 31 AT KANDUA GP UNDER SANKRAIL PANCHAYAT SAMITY UNDER 15TH FC FUND-2025-26 (ACTIVITY CODE-117200641)
Installation of Timer Electric Street Light (50 pc) at Udang-I GP area under Udang-I Gram Panchayat under Amta-I Panchayat Samity,Amta, Howrah, under 15th C.F.C.(Un Tied) for the year 2025-26 (Activity Code 115796730).