Loading…
Loading…
979 results • Latest
SC Division: DKJ-MUGR Section- Proposed replacement of existing 3x12.20m steel girders with 3x12.20m PSC Slabs for bridge no.152 at km.101/7-8 between AWM- MUGR stations
Supply Installation for Consumables Items for CHNSO Analysis
Maintenance and repairs to Open Drains and Nalas at various locations in Secunderabad Cantonment area for a period of one year.
Maintenance Services to Arboriculture Assets at Technical Areas (Zone-1) Kanchanbagh, Hyderabad
Maintenance of Arboriculture Assets at Technical Areas (Zone-5) RCI, Hyderabad
PROVISION OF BOREWELL INSIDE AD COMPLEX
Supply of Consumable
Construction of 6-lane VUP (1X20mX4.5m) at Km.202.860 (Panchalingala) under long-term rectification of MoRTH identified Blackspot (AP-02-085 / AP-04-183) along with Slip Road for Sunikesula Underpass (RHS) with MNB across KC canal on HYD-BLR section.
Repairs and Maintenance to the ground floor toilet at GPO Hyderabad 3rd call
Repairs and Maintenance to IQs at GPO Hyderabad 3rd call