Loading
Loading…
Loading…
4,609 results • Latest
Cement Concrete Work on Usmaniya Masjid Mai n Road at Loha Gate in Ward No. 02 under Zone No. 15
Providing, Laying, Jointing, Testing and Commissioning of 110,160,200250 and 315 mm dia HDPE Pipeline at Gurushankar Nagar, Shreeram Nagar etc of Zone No.14 Ward no.82 (as per schedule)
FIX Camera, PTZ Camera, 6 tb sas drive, 10 kva ups without bty, Network Switch
C.C ROAD AANTARIK MAARG SAH PULIYA NIRMAAN GRAM PANCHAYAT DUDHIYA BLOCK INDORE DIVISION INDORE
Water Campor, Water Dispensor, Pedestal Fan, Desert Cooler, Jumbo Cooler
For Supply of 11 and 33 KV Metering Equipments (Oil Immersed Combined CT PT Units) of assorted ratings/ratios and accuracy class of 0.5s for HT metering