Loading…
Loading…
163 results • Latest
Collection of green coconuts from coconut trees within Port area ensuring proper up-keep of the trees including dressing for a period of two years
Design, Engineering, Supply, Installation and Commissioning of 757 kWp / 742 kW or above capacity On-Grid Rooftop Solar Power Plant on 11 identified buildings
Design, Engineering, Supply, Installation, Testing and Commissioning of Cable Management System for the Shore to Ship Power Supply facility at Coal Berth I and Coal Berth II of Paradip Port.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; 9070C26B76 Agency for replacement of J Bend & RCSV body and refractory repair job along with supply and installation of vortex stabilizer in INDMAX unit a..
ELEMENT FILTER AIR PRIMARY, P/N: 94485646, ELEMENT FILTER AIR SECONDRY, P/N: 94485653
TROLLEY, WHEEL BARROW 2 WHEEL