Loading…
Loading…
315 results • Latest
Gate Management System Comprising Access Control, CCTV, FDA, Air-Conditioning (AC) & Fire Suppression, IT-LAN and Telephone Facilities at Plant Gates.
Out sourcing of various activities during maintenance of wagons at ROH & NSS Depot of BSL Division for a period of 18 months.
Jalgaon-Provision of 800m Precast Boundary wall at NRL Goods shed. (ID No.01.01.53.25.3.50.037)
DESILTING OF WELL NEAR STORAGE LAKE SHAHAPUR TAL JAMNER DIST JALGAON
Work-1- Repair/Overhauling of FTRTIL make E-70 Air Brake Panel of Three Phase Locomotives Qty-46 Nos (Loco Set). Work-2- Repairing and Rehabilitation of Driver Brake Controller of three phase electric Locomotive at ELW/BSL Qty-76 Nos (Loco Set).
CHOLESTEROL TEST KIT FOR EM 200 (FULLY AUTOMATED BIOCHEMISTRY ANALYSER) MADE BY TRANSASIA BIOMEDICAL LTD.
UREA TEST KIT FOR EM 200 (FULLY AUTOMATED BIOCHEMISTRY ANALYSER) MADE BY TRANSASIA BIOMEDICAL LTD. (KIT PACK SIZE: R1- 5 X 44 ML/R2- 5 X 11 ML). (As per detailed specifications attached)
RUBBER TOURNIQUATE FOR F.A.BOX (ESMARCH BANDAGE) SIZE 4" X 2.5 MTR. (As per detailed specifications attached)
A set of Online UPS with isolation trans [A set of Online UPS with isolation transformer & with IGBT-PWM technology of Caps:-10.0 KVA with SMF VRLS Batteries Minimum backup time 60-120 Minutes on full load (Preferably 12 Volt 65 AH X 16 Nos.) UPS Input Power Single phase 160V-260V AC, 50 Hz, Out Put power -Single phase 230-240 V+/-1% Sinewave, 50 HZ with connecting wires and accessories & with trolley stand for batteries with wheel, arrangement complete, Make for UPS-, Techser, Uniline ,Numeric, Luminous, Power Plus & Make for Batteries -Exide, HBL, Amron Quonta, Amaron, Exide Power Safe.
Design, Supply and Procurement,Erecting,Testing And Commissioning with 5 years comprehensive operation And Maintenance of Solar Power Plant under NET-METERING Policy at two locations.(68 KWp at Waghur Dam Pumping Station,35 KWp at WTP Kusumbe Shivar