Loading
Loading…
Loading…
142 results • Latest
Construction of ladies toilet in Running Room, SSE Office, DRM Office,Station Master Office etc. over Danapur Division.
Provision of Bridge inspection step, wing wall repairing and Epoxy plaster etc. of Bridge under ADEN/L/PNBE of Danapur Division
Shifting height raising of High Tension line for New Four Lane Bypass to Parbhani City Parwa to Asola Km 463 265 to km 481 180 Design Ch 19 220 to Ch 34 434 Length 15 214 Km section of NH 61 on EPC mode in the state of Maharashtra
Construction of a 2L PS Road Over Bridge ROB t km 2 135 parallel to the existing ROB and reconstruction of existing 2 lane ROB at km 48 557 to 4L PS standards in the state of Maharashtra on EPC mode