Loading
Loading…
Loading…
292 results • Latest
Routine, preventive and breakdown maintenance work of Complete Air Conditioning system under TMD in Unit-3 & 4 at Sikka TPS.
Work of Erection of 66KV D/C Bhomiyavadar - Gunda Panther tower line with AL-59 Equivalent to Panther Conductor on D/C tower having route length 11.788RKM.
Work of refurbishment of various spares of CW pump for Unit no.3 & 4 at Sikka TPS.
Work of application of Thermal Insulation & aluminum cladding of various ducts, piping, valves and water wall for Boiler Unit 3 & 4 on as & when required basis.