Loading…
Loading…
3,398 results • Latest
Construction of solar operated 150 mm x 100 mm Nominal Diametre size Light Duty Tubewell (LDTW) scheme up to a depth of 150 mtr. with UPVC pipe at mouza- Kusumbandhi
Construction of solar operated 150 mm x 100 mm Nominal Diametre size Light Duty Tubewell (LDTW) scheme up to a depth of 150 mtr. with UPVC pipe at mouza- Choto Enyata
Construction of Clustered Solar operated (3 Tube Well) 150 mm x 100 mm Nominal Diametre size Light Duty Tubewell (LDTW) scheme up to a depth of 150 mtr. with UPVC pipe at Mouza- Talkatmundi
Construction of 3 nos. solar LDTW scheme (in 1 cluster) at at Badina
Construction of 6 Nos LDTW Scheme Solar operated (in 1 Cluster) at Mouza - Kunyapara
Supply of Spare Parts suitable for GSC make Main Switch
Supply of Spares of WPIL Worthington make Submersible Pump Motor Spares
Supply of BMC make manually operating Oil Immersed Star Delta Starter Spares 20 HP 440 V Heavy Duty maintenance for different M.I. Installation under JhargramI (A-I) Sub-Division, Jhargram
Supply of Spares of WPIL Worthington make Submersible Pump Motor Spares Pump capacity 50 cumhr and 48 mtrs head Pump Model No B7 sc3 Motor No WM 8150 15 HP Pump
CONSTRUCTION OF NSTW BARA ASANBONI GOPI II JHARGRAM
CONSTRUCTION WORK NSTW TUBE WELL HANRULIA BINPUR I JHARGRAM
CONSTRUCTION NSTW CHANDIAS GOPI-II JHARGRAM
CONSTRUCTION NSTW SALPATRA NAYAGRAM JHARGRAM
Construction of resdual work of SFMIS at mouza Baradhanso Block Binpur I
Installation of 1 no. new clustered (6) Light Duty Tubewell (Solar) (Depth - 150 m) with PVC pipe at Chhota Ichapara(PIC-R301900230, CLMAS Project Code P2024100000000000915), Village- Chhota Ichapara(Village Code-19 18 002 0513), JL No 899, 765, 763
Installation of 1 no. new Clustered (4) Sprinkler Irrigation System (Solar) at Jamboni(PIC R301900231, CLMAS Project Code-P2024100000000000916), Village- Jamboni(Village Code-19 18 018 0104), JL No.- 104, Plot No. - 136/262, 56/125, 130, 14/497, 30
Construction of solar operated Light Duty Tubewell LDTW scheme
Construction of solar operated 150 mm x 100 mm Nominal Diametre size Light Duty Tubewell (LDTW) scheme up to a depth of 150 mtr. with UPVC pipe, at mouza- Kankro, J. L. No.- 258, Plot No.- 101 under G. P. - Chichira, Block -Jamboni within Jhargram D
Kathua mr periodical maintenance work
Construction of Concrete Road at Ramanandapur village from Ramanandapur Harimandir to Chheliasinga Garage under Sankrail Dev. Block
Post DLP Maintenance through e-Marg PMGSY road from Pheniamara to Tentulia within Gopiballavpur I Block in Jhargram District vide Package No. WB24MTN111 Length 3 Km
Providing of Out sourced man power of different categories in WBSRDA, Jhargram Division-1
Operation of Cross Regulator Gates at Ch. 960.00, Ch. 1032.00and Ch. 1145.00 of MBC and clearance of obstruction at Regulator and fall structures of Distributaries and minor canals under Chandra Section of K.C.Sub-Division- XIV under K.C. Division-IV
Operation of Cross Regulator gate at Ch. 446.00 of MBC and Clearance of obstructions at Regulator and Fall Structures of Dy. 19L of MBC and Minor Canals under Bhimpur Section of K. C. Sub-Div XIV of K. C. Division No-IV Midnapore
Repair and maintenance work of Additional District Magistrate(Development) Bungalow, Jhargram in respect of change of occupation under Jhargram Division in the district of Jhargram 2026-27.
Operation of Cross Regulator Gates at Ch.686.00 and Ch.821.00 of MBC and clearance of obstruction and regulating watering through Distributaries viz 20R 21R 22R 27R including its Minor and Sub Minor canals under Bhimpur Section of KCSD xii of KCD-IV
Repair and maintenance work of Additional District Magistrate(ZP) Bungalow, Jhargram in respect of change of occupation under Jhargram Division in the district of Jhargram.
Mending damages of potholes on different locations on Lodhasuli - Dahijuri - Kupannad Road in between chainage 12.50Km to 15.00Kmp under Jhargram Division, PWD in the district of Jhargram 2026-27.
Emergent repair work to various distributories of M.B.C. an Engagement of labour for smoothly operating gate at distributor no. 26L, 29L, 30L, 32L, 34L, 35L, 36L , Minor 1L of Dy 26L of Pirakata Section of K.C.Sub-Div. No-XII within K.C.Division IV
Repairing and restoration work including modification of floor an roof treatment work of a single storied building for NRC of Tapsia RH under Gopiballavpur-II Block, Jhargram. RN 23002197, Project ID -HF25264
Repair of Shed at Pathardanga ICDS Centre at Belpahari under Belpahari GP under Binpur II Development Block
Drawal of new 33 KV UG cable in between Chingra 33KV Substation to Gopiballavpur 33 kV Sub-Station for 33 kV 2nd Source to Gopiballavpur 33kV Sub-Station under Jhargram Division
Repairing of 17 Nos Solar Light in different location under PS No 68
Installation of Solar Light 12W and 1800 Lumens Stand Along LED Semi Integrated Solar System Drapadimore at Belpahari at Belpahari Village within Belpahari G.P. under Binpur-II Development Block
Installation of Solar Light 12W and 1800 Lumens Stand Along LED Semi Integrated Solar System Belpahari Pry School at Belpahari Village within Belpahari G.P. under Binpur-II Development Block
Soil Investigation for construction of Proposed New Bridge at Ch. 855.00 of Midnapur Branch Canal at Hatilot Mouza-Taldanga G.P.-Bhimpur,Block PS - Salboni, Dist-Paschim Medinipur.
Dismantling of Damage Part (1st floor) of Belpahari LAMPS Office under Binpur-II Development Block
Supply Of Micronutrients Disodium Octaborate Tetrahydrate
Supply Of Micronutrients Chelated-(Zn-EDTA).
Supply Of Herbicide Pendimethalin 30 Percent EC.
Supply Of Insecticide Buprofebfezin 15 Percent Aded With Acephate 35 Percent w/w WP
Supply Of Micronutrients Chelated-(Zn-EDTA).
Construction of Primary Health Centre (PHC) Under XV-FC HG During the Year 2024-25 at Laghata, Binpur-I Block under Jhargram District (4th Call)
Supply of good quality Fish Seeds of Indian Major Carps (150 gms. Size) and Lime (Calcium Oxide) in Paschim Medinipur District under the scheme Production of Big Fish (IMC) in big water bodies FY-23-24
WBPHE/EE/JMD/NIeT 05_33 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_32 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_31 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_30 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_29 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_28 OF 2026-2027