Loading…
Loading…
467 live266 closing this weekmost from Department Of Military Affairs and E-IN-C BRANCH - MILITARY ENGINEER SERVICES
467 results • Latest
CONSTRUCTION OF DIFFERENT WORK OF DIFFERENT VILLAGE OF MANDVI TALUKA PANCHAYAT
Renovation of District Treasury Office at Bhuj-Kachchh
Lowering, Laying & Jointing 140mm dia PVC Pipeline 1500 MTR from Lakhond New TW to Lakhond sump and Drilling of Bore, Construction Of Pump Cabin (2.00x2.00m) and Electrification Under Rejuvination Programme 2025-26
Pinion Puller for pulling out Traction motor pinion as per attached Drawing
Jungle Clearance Work at Kaswati Medium Irrigation Scheme near Village Lodai in Bhuj Taluka of Kachchh District for the Year 2026-2027
TWO YEARS CONTRACT FOR SUPPLYING OF DRINKING WATER BOTTLES OF 20 LITRES CAPACITY TO VARIOUS ISOLATED/SCATTERED LOCATIONS INSIDE & OUTSIDE PORT AREA AT KANDLA
REPAIR/ MAINTENANCE OF TRANSFORMER, GODs AND HT SWITCHGEARS AND ALLIED WORKS AT AF STN NALIYA UNDER GE (AF) NALIYA
TWO YEARS CONTRACT FOR SUPPLYING OF DRINKING WATER BOTTLES OF 20 LITRES CAPACITY TO VARIOUS ISOLATED/SCATTERED LOCATIONS INSIDE AND OUTSIDE PORT AREA AT KANDLA
Providing,Supplying, Lowering, Laying & Jointing Pipeline from Varnora Mota TW to Varnora Mota Village Sump and Construction of 2mx2m Pump Cabin for Varnora Mota Village Water Supply Scheme under Rejuvination Programme 2026-27
CONST. OF INTEGRATED SETTLER WITH ABR AT PRAGPAR VILLAGE, TALUKA PANCHAYAT RAPAR AYOJAN (2026/27)
CONST. OF INTEGRATED SETTLER WITH ABR AT SANVA VILLAGE, TALUKA PANCHAYAT RAPAR AYOJAN (2026/27)
CONST. OF INTEGRATED SETTLER WITH ABR AT ADESAR VILLAGE, TALUKA PANCHAYAT RAPAR AYOJAN (2026/27)
CONST. OF INTEGRATED SETTLER WITH ABR AT KANDAGARA MOTA VILLAGE, TALUKA PANCHAYAT MUNDRA AYOJAN (2026/27)
CONST. OF INTEGRATED SETTLER WITH ABR AT SAMAGOGA VILLAGE, TALUKA PANCHAYAT MUNDRA AYOJAN (2026/27)
CONST. OF INTEGRATED SETTLER WITH ABR AT NANA KAPAYA VILLAGE, TALUKA PANCHAYAT MUNDRA AYOJAN (2026/27)
PROVN OF RE-FABRICATED WALL FOR PERIMETER OF KIO AND PROVN OF PARKING SHED AT THE OFFICE OF GE(A) AND AGE UNDER GE (A) BHUJ
Providing consultancy services to study techno economical feasibility and carry out detailed survey, planning, design and to prepare detailed project report to utilize 1MAF water for 2 Links in Kachchh Region (Phase-III)
Construction of MDM Shed at Ayodhyapuri Primary School- Rapar. (2) Construction of a prayer shed at Rapar Secondary School.
Estimate For 150 MM & 100 MM Dia MM D.I. K-7 Pipelines In Front Of Thakar Samajwadi at- Rapar, (2) Providing and Fixing 300mm RCC NP-3 Drainage line in Ward No. 4 at - Rapar third attempted
Limited Tender for Procurement of 0.30 LMT to 0.50 LMT DAP (18-46-0) at WCI.
Construction of compound wall on Park and Play field plot in ward 6B at Adipur and Cleaning Work at Adisor Pond in Ward 2-A at Adipur (Kutch)
SUPPLY AND COMMISSIONING OF ITEMS OF PA PAGING
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Admin, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
DESKTOP WITH 16 GB GRAPHICS CARD, High End Desktop Computer, Line Interactive UPS with AVR (V2)
COB DATA WALL, Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1), Data Wall Controller
MAIN FUEL FILTER ASSY, WATER FILTER, OIL FILTER, PRE FILTER AND WATER SEPARATOR
Microscopes - Pathological and Research as per IS 4381, IS 5204, IS 4381, IS 5204 (Q3) (3 (3 ))
Buffer Solutions (V2) Conformingto IS15557 (Q3)
Passive Night Vision Binocular as per MHA QR (V2) (Q2), Passive Night Vision Monocular as per MHA QR (V2) (Q2) (3 (3 ))
Repair and Overhauling Service - Uninterruptible Power Supply (Ups) (DFM); REPAIR REMOVAL FITMENT OF SECURING BOLTS AND HELICON COIL SPRING OF RUNWAY INSET LIGHTS MAFI LIGHT; Yes; Buyer Premises
Personal Fall Arrest System-Full Body Harness Conformingto IS3521 (Part1) (Q3)
Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
Facility Management Services - LumpSum Based - Hostel; 20 Ltr Drinking water service; Consumables to be provided by service provider (inclusive in contract cost)
Construction of 11 No Recharge Bore Well in pond/checkdams portion (By Rotary Rig ) in various villages of Mandvi taluka of Kachchh District.(Package No.2) (Fifth Attempt).
DEVLOPMENT OF URBAN FOREST TREE PLANTING WORK AT RAPAR NAGARPALIKA, RAPAR ( Second Attempt)
FOR MCEW TO RESTORATION OF CHHATRI (TOMB 10) AT BHUJ FOR THE YEAR 2026-27
CONST. OF INTEGRATED SETTLER WITH ABR AT SANGHAD VILLAGE, TALUKA PANCHAYAT ANJAR AYOJAN (2026/27)
CONST. OF INTEGRATED SETTLER WITH ABR AT TAPPAR VILLAGE, TALUKA PANCHAYAT ANJAR AYOJAN (2026/27)
Supply of New HP and Canon Tonners/Cartridges and Epson L4260 Ink Bottle for printers of KLTPS GSECL
Supply erection commissioning of unit 3 new DCS system at KLTPS
Development of Bhootnath Mahadev Temple : Bhuj, Kutch
CONSTRUCTION OF PANCHAYAT GHAR AT VARIOUS VILLAGES OF RAPAR TALUKA, PKG:11/CDP5 ( MOTI HAMIRPAR & KHANDEK ) OF TAL RAPAR