Repair to HL Bridge over river Udanti at 2nd KM on Pwd road to Palna_Road_Repair to bridge such as minor repair to railing,expansion joint, painting along with repair to both side approaches _At 2.200 km
Repair to HL Bridge over Pipal Nallah on Kamthana to Ghusrigudi road _Road_Repair to bridge such as minor repair to railing, wearing course etc and painting along with repair to both side approaches_At 3.500 km