Loading…
Loading…
1,644 results • Recent activity
Installation of Hydram with Sprinkler Irrigation Distribution System Hydram Size 50mm x 25mm at Middle Simana Jhora at Mouza Lingsey Khasmal Block Pedong in the District of Kalimpong under the Executive Engineer AM Jalpaiguri AM Division
Recovery and Reconstruction of Road and Drain from 0.00 km to 1.00 km of Reyan Road for mending damaged occurred due to heavy rainfall from 04.10.25 to 05.10.2025, under Kalimpong Division PWD in the district of Kalimpong
Recovery work to the road from 27.30 km to 28.00 km, 28.20 km to 28.60 km and 29.00 to 29.10 km of Teesta Valley Road for mending of damaged Occurred due to heavy rainfall during the period from 04.10.2025 to 05.10.2025 under Kalimpong Division PWD
Repairing of Dantay ICDS center (window) feacing at Dalman Gaon ICDS center PS no,130,under Bhalukhop GP
REPAIRING OF NAVDIP SAMAJ GHAR, TEESTA GP WITHIN KALIMPONG-I DEV. BLOCK UNDER AMADER PARA AMADER SAMADHAN
Construction of Road from Tirtha Bir Golai to UCNI Church at,Nimbong GP within Kalimpong-I Dev. Block under Amader Para Amader Samadhan