Loading…
Loading…
1,592 results • Recent activity
Annual maintenance of pipeline and pipeline track from 85mts span steel bridge (Ch. No. 92 to Ch no.178 towards Lava for the period of 01.08.2023 to 31.07.2024. under NKWSMD, PHE Dte. Kalimpong. SL NO-4
Annual maintenance of pipeline and pipeline track from Dhaula intake to 85 metre span steel bridge (Ch No of 0-92) including the maintenance of Dhaula intake, Dhaula V-notch chamber for the period of 01.08.2023 to 31.07.2024. under NKWSMD, PHE Dte.
Annual maintenance of 300 mm dia.and 250 mm dia. CI/M.S parallel pipeline and pipeline track from (Ch. No.112-224) to Dhaula for the period of 01.08.2023 to 31.07.2024. Under NKWSMD, PHE Dte. Kalimpong. SL NO-2
Construction of CC road from Bharat house , Lower Chibbo Lepcha Gaon to Poshyor bridge of Kalimpong GP under Kalimpong I Dev. Block
Construction of Community Hall at 12 Mile (Nawa Udai Samaj) under Sindepong G.P within Kalimpong-I Development Block.
CONSTRUCTION OF KITCHEN AT TRIVENI PARIWAR SAMAJ PS 22/195 DUNGRA GP WITHIN KALIMPONG-I DEV. BLOCK UNDER AMADER PARA AMADER SAMADHAN