Loading…
Loading…
2,141 results • Recent activity
PAD ASSY, AIR FILTER, OIL FILTER, BODY OIL FILTER, FILTER FUEL, WATER PUMP ASSY, COVER OIL ASSY, REPAIR KIT
AIR CYL HEAD GASKET CONSISTING OF 7, ASSY CROSS KIT, MOUNTING RH REAR, OIL SEAL, O RING
Hiring of Consultancy Services - Percentage based - Structural Drawing and Design Services; Engineering Design; Yes; Hybrid(As specified in scope of work)
SHOE SET REAR BRAKE, SPRING PAD, CIRCLIP, BUSH, TOOL BOX, BOLT 12X38, PIPE RADIATOR OUTLET, REGULATOR ASSY, CUTTING PLIER, PLUG OIL FILTER, LAMP ASSY SIDE TURN SIGNAL LH, OIL SEAL, PACKING LOCKING HUB, REGULATOR ASSY FRT DR WINDOW LH, CARPET FLOOR TUNNEL REAR, BUSH SPRG SHACKLE, HOSE WATER BY PASS, CLIP DOOR TRIM, BULB 12V 3.4, LAMP ASSY COMBINATION LH, HALF ENGINE ASSY 4 VALVE MPFI, ENGINE OVERHUAL KIT CONSISTS OF 45 ITEMS
Electrostatic Discharge Chairs (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7081908 Dated : 08-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 40000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Single Cylinder Manifold for Dry Air, Nitrogen and Oxygen gas service in the Cylinder Room at Ground Floor, Single Cylinder Manifold for Hydrogen and Methane gas service in the Cylinder Room at Ground Floor, Additional Cylinder Brackets for holding 47ltrs, Point of Use Regulator with Panel for Gas Service Dry air, O2, N2 and H2 with accessories, Point of Use Regulator with Panel for Gas service O2, N2, H2 and Methane in the 2nd Floor Lab with accessories, Hydrogen Cylinder set up with Cylinder Bracket and Cylinder mounted Pressure Regulator in NEMS Laboratory at 2nd floor, Point of use Regulator at NEMS Lab with Panel having Ball Valve, Outlet connection 6MM Push fitting, Single Cylinder Manifolds for N2 and Dry Air Service for 2nd floor lab, Point of use Regulator in Panel in the lab at 2nd floor for N2 and Dry Air with Ball Valve, Outlet connection 8MM Push fitting, Tube laying with 1by4 inch OD SS Tube accessories, qty. in ft., Caping Casing 2 inch X 2 inch for laying above tube, Tube laying with 1by4 inch SS Tube with 1by4 inch od Tee 2nos, and accessories, qty. in ft., Caping Casing 2 X 2 for 1by4 inch laying tube, Tube laying at 2nd floor lab with 1by4 inch od SS Tube with accessories, qty. in ft., Casing and caping size 2inch X 2ich for above tubing, Tubing with 1by4 inch od SS Tube with accessories, 8MM polyurethane Tubing, qty. in ft., Pneumatic Fitting Straight Union PU 8 Push in Connector for 8mm OD Hose