Loading…
Loading…
199 results • Latest
Tissue Box (V2) (Q4)
Disinfectant Fluids, Phenolic Type (V5) conforming to IS 1061 (Q2), Alcohol Based Hand Sanitizer (Q2) ( ( 3 3 ))
A/mtc of L/s work in sector-13, U.E. Karnal for the year 2026-27.(Repair of Hydrant connection of underground 4 pipe line of green belt and HSVP Nursery sector-13 and all other work contingent theretocomlete in all respect.)
A/mtc of L/s work in sector-13, U.E, Karnal for the year 2026-27.(Repair of submersible motor with 8 stage pump recleaning , finishing of fallen pipe and submersible motor and all other works contingent thereto.)
Development of Green Belt along GT Road in Sec-5, Karnal (Providing and fixing of Grill Fencing on brick toe Wall , Main gate , wicket gate with three year mtc and defect liability period free of cost and all other works contingent thereto.)Pocket-II
Repair of Toilet at GSSS Bansa Repair of Boys Toilet in GSSS Arainpura, Const. of CWSN Toilet in GSSS Dacher Const of Cwsn toilets in Ggsss Assandh, PM shree Gsss Chochra, Gmssss Padha and Gsss Ramba Block Assandh Distt Karnal (Under DSE)
Const of 05 ACRs, repair of 10 ACRs and Multipurpose Hall in GSSS Bhadson, Const of Boundary Wall and Pathway in GMSSSS Biana, Const of Boundary Wall and Repair of Existing rooms at PMSHRI GSSS Garhi Birbal in Block Indri, Distt Karnal (Under DSE)