Loading…
Loading…
3,786 results • Latest
Improvement of Andhey Chak Khul by way of laying of knitted crate revetment near the land of Sh. Yog Raj and others near Shiv Temple
Improvement of Saibra Khul by way of construction of khul section and crate protection work b/w Rd 0-500M at spots under District sector.
Spot Treatment at RD 1800m of Main Drung Canal
Construction of pacca section and lay of bed from Rd 200-600m of Main Canal at spots of Didwara Lis
Construction of pacca section at RD 3370m and 4990m of Main Naj Canal and at Rd 1410 m of D1 of Naj Canal
Construction of CFC with attached bathroom, at W.No. 3, Panchayat Upper Thall, Block Lohai Malhar
Chain link Fencing/ Iron Fencing at Main Pond Banhore Pyt. Dambra East Block Mahanpur
Branding & Painting of AAM Plail, Branding & Painting of AAM Dharmkot, Branding & Painting of AAM Tumboo
3.5 Inch Analog Ruggedised Training FPV
Please refer in BOQ
Please refer in BOQ
Please refer in BOQ
Const. of Stage Shed at Mela Ground Surjan W.No. 1 Pyt Surjan Block Duggan
Construction of lane main road to house of romela ram and others ward no.1(2.00) construction of lane from Tractor Road to the house of prem singh slaria and others ward no.2 (1.10) Panchayat Aglidhar Block Nagrota Gujroo
Const. of Sub center Building at Panayalog Pyt Chaloge Block Duggan
Facility Management Service- Manpower based (Version 2) - Industrial; Providing assistant to R&M of Residential & Non- Residential buildings, Water supply, Collection of garbage at Sewa Vihar Colony and its disposal at designated location at sewa II P..
DISTRIBUTION TRANSFORMER 1MVA, 33/0.415KV, 3P, HV SIDE DELTA AND LV SIDE STAR, ONAN COOLING CU WOUND
Level Transmitter Radar Type (Q3)
Constt. of B wall alongwith gate in GHS Dilwan
Const. of Culvert at Chapparu w.no 6 Pyt Duggan Block Duggan
Const. of Ayurvedic Dispensary Building at Duggan Pyt Duggan Block Duggan
Const of Anganwari center Building at Morrori Pyt Chaloge Block Duggan
Facility Management Services - LumpSum Based - Supply, Installation of Iron Dustbins & Commissioning of E-Cart Garbage E-Rickshaw; Job Work; Consumables to be provided by service provider (inclusive in contract cost)
SHIFTING OF 66 KV HT LINE CROSSING OVER THE RESIDENTIAL HOUSES AT WARD NO. 16 UPPER SHIVA NAGAR, KATHUA under the jurisdiction of Sub-Transmission Division Kathua.
Construction and Maintenance of road from L023 (Link road) Garh road Km 1st to Manowa, Package No. JK07-4508, PMGSY-IV, Batch-I of 2026-27, Block Mandli, District Kathua. Using Waste Plastic, Length-2.250 Kms
Construction and Maintenance of road from L025 (Link Road) Sejal Garh road RD 1.500 to SC Saryara, Package No. JK07-4515, PMGSY-IV, Batch-I of 2026-27, Block Billawar, District kathua. Using Open Graded Premix Carpet (OGPC) Length-2.70 Kms
Const. of Foot Bridge at Naltu Nallah Jarnail W.no.3 Pyt Duggan Block Duggan
Constt of pacca lane at Kuthed Nag mandir towrads pond and constt of pacca lane at serri Panchayat Sitti Block Bani
Construction of Lane at Patti ward no 4, Ghodal Block Dhar Mahanpur
Const. of of Pacce Lane from Majru Mohalla to Dubta W.No. 1 Pyt Surjan Block Duggan
Refer to BOQ
Const of 02 No of Tile Work at Galkhad Mohalla and Ground of UPS Backon Pyt Surjan Block Duggan
Refer to BOQ
REfer to BOQ
Refer to BOQ
Supply, Erection, Testing and Commissioning for REALIGNMENT/SHIFTING OF 66 KV CIRCUIT 601 and 602 NEAR NAGROTA BUDHI VILLAGE under the jurisdiction of Sub-Transmission Division Kathua.