Loading…
Loading…
216 results • Latest
Kushumita-Uppeakampdihi Part-II_Road_SDBC_0.000 to 1.850 2.000 to 3.610
Repair to H L Bridge over Machhakandana on NH 215 to Ambuapada via Bhaliadihi_Road_Mastic asphalt -wearing coat- Boulder pitching, Pot hole repair in approch road, Railing repairing and Painting etc_At 4.000 km
Repair to Bridge of Local nallah at 6th km on Telipada to Suhagpur road_Road_Mastic asphalt -wearing coat- Boulder pitching, Pot hole repair in approch road, Railing repairing and Painting etc_At 6.000 km
Repair to H.L. Bridge over Neuijodi nallah at 1st km. on Putugaon to Chemna road_Road_Wearing coat, Boulder pitching, Pot hole repair in approch road, Railing repairing and Painting etc_At 0.500 km
Repair to HL Bridge over Local Nallah on Jamudiha to Bistapal road -Balance work-_Road_Mastic asphalt -wearing coat- Boulder pitching, Pot hole repair in approch road, Railing repairing and Painting etc_At 2.000 km
Repair to H L Bridge over Sita Nallah on Danguaposi to Sitabinji Road_Road_Mastic asphalt -wearing coat- , Boulder pitching, Railing repairing and Painting etc_At 1.000 km