Loading…
Loading…
572 results • Latest
CONSTRUCTION OF NEW MAJOR H.L. BRIDGE LANTH-I AT CH 113/960 Km AND LANTH -II AT CH 114/446 Km OF NH 26 IN THE STATE OF ODISHA IN EPC MODE
30 MeV Cyclotron, with all accessories for research applications and the production of 18F - radio pharmaceuticals
Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km 38.500 (Design ch. 6.750) of NH-157 in the state of Odisha on EPC Mode
Construction of Tel Bridge with approaches at Km 126.744 of NH-26 in the state of Odisha on EPC mode
Implementation of NAT testing facility with ID methodology having available technologies covering Blood Centres of the State of Odisha on PPP mode
Construction of 2 Lane Bridge at Km 21.206 and Km 26.983 at Bargarh District on NH-26 in the State of Odisha under EPC Mode