Loading…
Loading…
344 results • Latest
Annual mtc. of residential and non-residential Govt. quarters and office buildings at Teliamura PWD complex during the year 2026-27/SH- Mtc. of PWD staff quarter Type-I, Type-II, Type-III, Non type quarter and office buildings in/c allied works.
Renewal of PMGSY road under Teliamura Division during the year 2025-26/ Periodical Repair of Road from DM Para to Malakuthui Para (Missing Link) (Missing Link of L-030), Package No.TR-01-173, Phase (VIII) (L-1.965 km)/ SH- (A) Initial Rehabilitation,
Development of PWD road from Bharat Kalyan Club to Polestar club area via English Medium School L 0.25 Km under PWD RandB Khowai Subdivision 25 Khowai constituency during the year 2026 27 SH Earth work PCC Traffic signs, Paver Block work etc.
FDR of different PWD roads under PWD RandB Khowai Subdivision during the year 2026 2027 SH WBM III Pot hole repair Grouting Seal coat Surface drains etc. Gr II
Repair and maintenance of toilet block of BOP Jai and Sidhai at 104 Bn BSF under SHQ BSF Teliamura
Strengthening of road from Brindabanghat to Tulashikhar Bazar from Ch 0.00km to Ch 2.00km under Tulashikhar RD Block during the year 2025 26 Length 4.00km SH Widening, GSB, WBM 2 and 3, DBM, BC, CD, Protection work etc. Group 1
Development of road from Hatath Colony to Border road L850.00 mtr. under PWD RandB Khowai Subdivision during the year 2026 27 SH Construction of RCC drain and RCC drain cover 2nd Call
Ultrasound Machine (V2) (Q2)
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Fitting Fixing, Repairing and Maintenance of LED Street Light under Khowai Municipal Council, Khowai during the year 2026-27 Total LED Street Light 3891 Nos. 2nd Call
Demolishing of Kalyanpur ARDD Hospital at Kalyanpur, Khowai District, Tripura (2nd Call)
Strengthening and improvement of riding quality of road from Satyaguru Para to Santinagar via Ghilatali, Dao Cherra and Dakshin Durgapur Length 13.95 Km under Khowai , Tripura
Supply of different type of planting materials during 2026-27
Development of road from Sukantasmiriti Vidyalaya to Anandamarga School L 0.55 km under PWD RandB Khowai Subdivision during the year 2026 27SH WBM III Recarpeting Seal Coat Protection work Drains Paver Block etc.
Development of road from NH 108 to Polestar Club via Manipuri para L 1.40 K.M. from Ch. 600.00 M to 1400.00 m under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM PMC Seal Coat Drain etc. Gr 2
Development of road from NH 108 to Polestar Club via Manipuri para L 1.40 K.M. from Ch. 0.00 M to 600.00 m under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM, PMC, Seal Coat, Drain etc. Gr 1
Mtc. of Road from TK Road to Bazar Colony Road (L-0.60km)/S.H-Construction of RCC Retaining Wall at CH. 0.260 km , Brick Masonry Retaining wall at CH. 0.210 km, Pucca drain etc. during the year 2026-27.
Construction of Deputy Director of Horticulture office at Khowai under Khowai District SH Providing Internal Electrification.
Mtc of road from Hranghkhal-Debthang road to Zion tang girls hostel road (Length-2.45 km) (portion from 1.225 km to 2.45 km) /SH- Restoration of different stretches of road embankment damaged due to heavy rain by laying PVC coated ....... (2nd Call)
Providing Internal Electrification for 03Nos.HSC under R.D Teliamura Division (as per PWD SoR I/E- 2021)i Chakmaghat Sibir HSC at Chakmaghat GP of Teliamura RD Block ii Namanjoybari HSC Mungiakami RD Block iii 43 Miles HSC at Atharamura VC Mungiakami
Providing Internal Electrification work for 3Nos. HSC of Teliamura RD Block under R.D Teliamura Division(as per PWD SoR I/El-2021)i Baramura GTP HSC at Sardakarkari VC ii Moharcherra HSC at Moharcherra GP iii Hrankhawal Bazar HSC at Sardakarkari VC
Construction of Office building of District Transport office at Teliamura under RD Teliamura Division/SH - Providing Permanent Internal Electrification work thereof. (As per PWD SOR-I/ Electrification- 2021).
PROVIDING IE WORKS AT NEWLY CONSTRUCTED CHEBRI HS SCHOOL, KHOWAI DISTRICT, TRIPURA
PROVIDING I.E. WORKS (CONCEAL) INCLUDING FIRE DETECTION SYSTEM IN THE NEWLY CONSTRUCTED POST-OPERATIVE AND OT BLOCK AT KHOWAI DISTRICT HOSPITAL.(3RD CALL)
Extension of pipeline Other allied works in different locations of existing water supply schemes with constriction of RCC plat form hydrant post under DWS Sub-Division Padmabil (Gr-II).
Extension of pipeline Other allied works in different locations of existing water supply schemes with constriction of RCC plat form hydrant post under DWS Sub-Division Tulashikhar (Gr-II).
Extension of pipeline Other allied works in different locations of existing water supply schemes with constriction of RCC plat form hydrant post under DWS Sub-Division Mungiakami (Gr-II).
mprovement of road from Rabicharan para to Chowkider hour para length 1.50km from Ch 0.50Km to Ch 1.00Km under Tulashikhar RD Block during the year 2026 27 SH GSB WBM 2 and WBM3 Carpeting Seal coat Retaining wall CD and protection work etc.
Development of road from Marehaduk to Ampura Moglam road L 2.28 Km under Padmabil Block 24 Ramchandraghat constituency during the year 2026 27 SH Patch metalling Re-carpeting seal coat Surface Drain Pucca drain Paver Block etc.
Development of road from Bhaktapara to KMR School NH 108B L 1.50 KM under Padmabil Block 24 Ramchandraghat constituency during the year 2026 27 SH Patch metalling Re-carpeting seal coat Surface Drain Toe wall etc.
Development of Baijalbari Sub Zonal Office to Athaibari road under PWD RandB Padmabil Subdivision 24 Ramchandraghat constituency during the year 2026 27 SH Earthwork WBM 3 Pothole Repair Recarpeting Seal Coat Surface Drains Protection Works and Roa
Development of road from Panditram bari to Narayan Chowmuhani-Gourangatilla road L 0.350 km under Padmabil Block 24 Ramchandraghat Constituency during the year 2026 27 SH Earth work, GSB, WBM 2, WBM 3, Carpeting, Seal Coat, Pucca drain, Retainin
Development of road from Panditram bari to Narayan Chowmuhani-Gourangatilla road L 0.350 km under Padmabil Block 24 Ramchandraghat Constituency during the year 2026 27 SH Earth work, GSB, WBM 2, WBM 3, Carpeting, Seal Coat, Pucca drain, Retainin
Development of road from Twihaching to Hazaribari L1.084 km under Padmabil PWD Subdivision during the year 2026 27 SH Retaining wall, side stripping, WBM III, Grouting, Re carpeting, Seal coat Surface drains, pucca drains etc. from Ch0.35 Km to 0.
Development of road from Twihaching to Hazaribari L 1.084 km under Padmabil PWD Subdivision during the year 2026 27 SH Retaining wall, side stripping, WBM III, Grouting, Re carpeting, Seal coat Surface drains, pucca drains etc. from Ch 0.00 Km t
Maintenance of various roads under PWD RandB Padmabil Subdivision under Padmabil RD Block 24 Ramchandraghat Constituency during the FY 2026 27 SH Stripping of excess soil, surface drains,Grouting, WBM 3 seal coat take coat shelmac etc.
Maintenance of the various roads under Tulashikhar Block during the year 2026 27 SH Brick Soling, WBM 3, carpeting and grouting.
Repairing of existing Pump House and existing pipe line maintenance of hydrant point, with other allied works in different scheme under DWS Sub-Division Mungiakami
Extension of GI/UPVC and other allied works etc. complete at DTW at Shan Para- II, DTW at New Rangitilla and other Locations within the Jurisdiction of Mungiakami DWS Sub -Division
Setting up of new Agri Development cum Training Center with IT facilities at Kalyanpur under Khowai District SH Providing Electrical installation. (4th call)
Mtc of road from Hranghkhal-Debthang road to Zion tang girls hostel road (Length-2.45 km) (portion from 0.00 km to 1.225 km) /SH- Restoration of different stretches of road embankment damaged due to heavy rain by laying PVC coated GI.......... /Gr.I
Improvement of road from Wandalwng PWD NH To Subhananda para Under Padmabil RD Block L1.00 Km SH GSB,WBM, carpeting and other allied works.
Improvement of road from Rasarajnagar Panchayat PWD road to Battali L 992.0 m under Padmabil PWD Subdivision during the year 2025 26 Sh GSB, WBM2, WBM3, Prime coat, Tack coat, Carpeting, Seal coat, Pucca drains, Retaining wall, Box cell, etc.
OR of the road from Hatimara A to Parsuram bari B L 1.704 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III, Recarpeting, Seal Coat, Protection work etc.
evelopment of Old NEC to Bhatimaidan road at Ch. 0.50 Km under the jurisdiction of Champahour Subdivision, Tulasikhar Block during the year 2026 27 SH Protection of road embankment by wire crest. Group II
Development of the road from Bidyabil Bazar to Karangicherra BOP Camp from Ch. 0.75 Km to 1.50 Km L 1.50 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III, Recarpeting, Seal coat, Protection work etc. Gr II
Development of the road from Bidyabil Bazar to Karangicherra BOP Camp from Ch. 0.00 Km to 0.75 Km L 1.50 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III, Re carpeting, Seal coat, Protection work etc. Gr 1
Development of the road from TK road Diversion to Asharam para Awc L 400 m under PWD RandB Khowai Sub Division during the year 2026 27SH Earthwork, Pothole Repair, patch WBM III, Recarpeting, Road side drain.
Construction of Boundary Wall and Yard Development for Village Level Farmers Advisory Centre at Sonatala.
Development of the road from PMGSY road to NH 208 L300 Mtr. under Khowai Subdivision during the year 2026 27 SH Earth work, Pothole repair, patch WBM III, Recarpeting. Road side drain.