Loading…
Loading…
1,417 results • Latest
Manufacturing and Supply of PINION FORGING- to part No. 113FD52338
130SU51273 - BOSS FORGING
KIT, ELECTRIC POWER TRAIN ITEMS to Part No. 434EG00112
112931032252-NEEDLE ROLLER 3 X 21.8 B2 ZRI PNI 8502
112931031653-ROLLER 3X15.8
Reconstruction of bridge at 41.20 km on the Kottapalli-Masti (SH-99) road and Reconstruction of dilapidated bridges at 4.80 km and 13.00 km on the Srinivaspura-Punganur road in Srinivasapura taluk Kolar District
8002600835 C SPANNER FOR OUTTRIGER CYL GLAND, 8002600845 C SPANNER FOR OUTTRIGER CYL PISTON
00780502550 5 T. C. INSERT CNMG 120408 COATED (P25- P45), 00780502504 5 T. C. INSERT DNMG 150608 COATED (P15-P35), 00780103220 5 T. C. INSERT CNMG 190612 COATED (P25-P45)
130TF33852 GUIDE CASTING
130TF33803 BOSS LH CASTING, 130TF33829 BOSS RH CASTING
1TUBE ASSY, 2TUBE, 3TUBE ASSY, 4TUBE ASSY, 5TUBE ASSY
Main Frame Str - 451MF02109
Minimus coupling
512ZZ10373 -PUSH BUTTON SWITCH
112931032452-ROLLER II 3X23, 8
Providing Crash Barrier Statdium to Anganavadi (Towards Muneshwara nagar) Antharagange road CMC Kolar limit.
Repair work for IDSMT Building of Commercial shops behind KSRTC Bus stand in CMC Kolar
Development of Highmast Circle in ward No.23 Kuvempu circle near Ameen Masidi in Kolar CMC Limit.
112412120500-ROLLER BEARING RNU 2128
Bus Hiring Service - Regular Basis - Outstation 24*7; 13-15; Semi Deluxe with AC; As per Buyer requirement
1TUBE ASSY LH OUTER, 2TUBE ASSY LH OUTER, 3TUBE ASSY LH OUTER, 4TUBE ASSY LH OUTER, 5TUBE ASSY LH OUTER
SUPPLY OF PRESSURE SENSOR
1200351916 cutting edge
Air Bubble Sheets, Brown Adhesive Tape, BOPP BROWN TAPES
Supply of Steel Alloy Tubes
Procurement of Steel
Supply of Special Alloy Rounds Squares and Equal Angels
Improvements to feeder channel of Hudukula in Chikka Anakandahalli Grama Panchayat Bangarpete Constituency, Kolar District.
Construction of Check dam and main canal near Schedule Caste Farmers Land in Chinnakote Village, Chinnakote Panchayathi, Bangarpete taluk, Kolar District.
Tender for PM-USHA Academic Programme Management, Training Support and Event Coordination Services at Bengaluru North University
Reconstruction of Dilapidated Low Level Causeway at Chainage 6.10 Km on the Road Connecting Avani to MRF Road via Ramapura, Urukunte, Mitturu, Marakalaghatta and Batlabavanahalli in Mulabagilu Taluk
MF MATCHING TRANSFORMER, TYPE: HK-723, END PLATES WITH SEALING FOR MF TRANSFORM
SPHERICAL ROLLER BEARING, SPHERICAL ROLLER BEARING 22309
130FD32363 CARRIER
Manufacturing and Supply of SHAFT FORGING- to part No. 113FD52362
1CBOX 045cmX025cmX020cm7 PLY B FLUTE 220 GSM, 2CBOX 053cmX049cm X022cm7 PLY B FLUTE 220 GSM, 3CBOX045cmX027cmX021cm 7 PLY B FLUTE 220 GSM, 4CBOX016cm X016cmX012cm 7 PLY B FLUTE 220 GSM, 5CBOX 025cmX 025cmX012cm 7 PLY B FLUTE 220 GSM, 6CBOX022cmX022cmX015cm 7 PLY B FLUTE 220 GSM
Procurement of Laboratory Materials and Consumables to
Estimate for Advance work ANR Model-04 M3 Trench 8x12 pbs, 1000 Plants or ha towards Range Forest area in Bangarpet range during 2026-27 (25ha)
Estimate for Advance work ANR Model-04 M3 Trench 8x12 pbs, 1000 Plants or ha towards Range Forest area in Srinivasapur range during 2026-27 (25ha)
Estimate for Raising of Plantation in encroachment evicted area ANR Model 02 pits 8x12 pbs, 440 pits or ha) towards H Mallandhalli Sy No.10 and 95 (21 encroachers) at Kolar range during 2026-27 (16.461ha)
Estimate for Advance work (0.75 M3 pits, 10x16 278 Seedlings or ha) towards Srinivasapura Kasaba gomala Beat Sy No.88, Block-02 at Srinivasapur Range during 2026-27 (25ha)
Estimate for Advance work (0.75 M3 pits, 10x16 278 Seedlings or ha) towards Tamatamakanahalli Sy No.173 and 181 Gullahalli Sy No.98, Block-02 at Malur Range during 2026-27 (25ha)
Estimate for Advance work (0.75 M3 pits, 10x16 278 Seedlings or ha) towards Tamatamakanahalli Sy No.173 and 181 Gullahalli Sy No.98, Block-01 at Malur Range during 2026-27 (25ha)
Estimate for Advance work (0.75 M3 pits, 10x16 278 Seedlings or ha) towards Srinivasapura Kasaba gomala Beat Sy No.88, Block-01 at Srinivasapur Range during 2026-27 (25ha)
Estimate for Advance work (0.75 M3 pits, 10x16 278 Seedlings or ha) towards KSF 2nd Block, Balamande Sy No.215 Block-01 at Bangarpet Range during 2026-27 (25ha)
Estimate for Advance work (0.75 M3 pits, 10x16 278 Seedlings or ha) towards KSF 2nd Block, Balamande Sy No.215 Block-02 at Bangarpet Range during 2026-27 (25ha)
Estimate for Advance work (0.75 M3 pits, 10x16 278 Seedlings or ha) towards KSF 1st Block, Kadarinatha Sy.No.13, Bodapatti Sy.No.31 and Kunndarasanahalli Sy.No.5, Block-02 at Bangarpet Range during 2026-27 (25ha)