Loading…
Loading…
2,721 results • Latest
BRAKE EQUALIZER(TOP AS PER CLW DRG.NO. 06/4/19/110. FOR WAG-7
Construction Of Internal Road At-Nartawade Tal-Radhanagari Dist-kolhapur (Bagadi Galli- Balkrush Magdum To Ashok Yerudkar House) Latitude-16.4199 ,Longitude 74.0753, Length-187.00M)
BALL POINT METAL MARKER (60ML) OF NOZZLE [BALL POINT METAL MARKER (60ML) OF NOZZLE 5 MM, EXTRA NOZZLE OF 2, 3, 4 MM COLOUR: WHITE & Black (50% Qty. White and 50% Qty. Black), SUPPLIED ITEMS SHOULD HAVE A VALID/ BALANCE SHELF LIFE OF MORE THAN 24 MONTHS FROM THE DATE OF SUPPLY. ]
Improvement to road ODR 62 to Kudutri Gaibi Mallewadi to Bujawade to join ODR 64 road ODR 63 Ch.3/200 to 4/500,Tal.Radhanagari, Dist.Kolhapur
Construction Of Gram-Panchayat Office Building At Village Talgaon, Tal.- Radhanagari, Dist.- Kolhapur. (Shri. Balasaheb Thackeray Smurti Matoshri Gram-Panchayat Bandhani Yojana -- 2024/2025)
Replacement of existing 21m GB MARR tower with 21m Nokia GB tower ic dismantling existing MARR tower, RCC tower foundation, tower erection Painting earthing OD BTS platform at Rashiwade Radhanagari SDCA in Kolhapur BA under Phase IX 2 project
Replacement of existing 21 m GB MARR tower with 21 m Nokia GB tower ic dismantling existing MARR tower, RCC tower foundation tower erection Painting earthing OD BTS platform at village Sadle Madle Karveer SDCA in Kolhapur BA under Phase IX 2 project
Replacement of existing 21 meter GB MARR tower with 21 meter Nokia GB tower including dismantling existing MARR tower RCC tower foundation tower erection Painting earthing OD BTS platform at village Solankur Radhanagari SDCA in Kolhapur BA
Construction of School Building at Vidya Mandir Nandgaon Tal-Karvir
Providing Specail Repair Work for Vidya Mandir Nandgaon Tal-Karvir
CONSTRUCTION OF ADDITIONAL TWO CLASS ROOM AT VIDYA MANDIR BAHIRESHWAR TAL-KARVEER DIST-KOLHAPUR
CONSTRUCTION OF ADDITIONAL TWO CLASS ROOM AT VIDYA MANDIR UPVADE TAL-KARVEER DIST-KOLAHPUR.
PROVIDING SPECIAL REPAIR WORK FOR VIDYA MANDIR SULKUD TAL-KAGAL DIST-KOLHAPUR
PROVIDING SPECIAL REPAIR WORK FOR VIDYA MANDIR KANDALGAON TAL-KARVEER DIST-KOLHAPUR
CONSTRUCTION OF SCHOOL ROOM BUILDING AT VIDYA MANDIR BOLAVI TAL-KAGAL DIST-KOLHAPUR
CONSTRUCTION OF TWO ROOM SCHOOL BUILDING AT VIDYA MANDIR SHINDEWADI TAL-KAGAL DIST-KOLAHPUR.
Development of Premises ITI Building at Turkewadi, Taluka- Chandgad, Dist-Kolhapur.
Construction of a Sakav across the stream leading to the agricultural farmlands of the Dalit Vasti residents in Mouje Devarde,Taluka- Bhudargad, District - Kolhapur.
Road Furniture on Radhanagari Bhudargad Ajara Constituency on all MDR Road
Rubber Bush used in Aluminium cable cleat for traction motor as per No. 4TWD.096.036 Alt 1 or latest and conforming to CLW Specification No. CLW/ES/3/0039 Alt.F or latest alteration prior to tender opening date only.
Est.No.111467 of 2025-26 Prov.E.I street light, water pump,Fire fighting, 8 Passanger lift, and for newly constructed B1.B2, G.4 Karveer Tahsil office building at Kolhapur, Tal-Karveer, Dist.Kolhapur.
One year maintenance to road starts from SH 180 Patane phata Mangaon Shivanage Nittur Kowad to join MDR 61 road MDR 67 Km 0/00 to 14/600 Taluka- Chandgad, Dist- Kolhapur.(AMC Ch.0/00 to 7/400, 14/00 to 14/600) II Call
One year maintenance to road starts from NH4 Kavalikatti Daddi Rajgoli Kudnur Kalkundri Kagani Kini Nagardale Kadalage Dholgarwadi Mandedurg Karve to join SH 180 road MDR 65 Km 7/00 to 33/900 Tal- Chandgad, Dist- Kolhapur.Secnad Call
PAINT PU TOP COAT COLOUR BLUE
A.M.C to vengurla amboli district border to shirgaon naganwadi to belgaum state border SH 180 KM 77/400 to 88/800 Tal-Chandgad,Dist-Kolhapur. (Secand Call)
10.Supply of pavilions and related materials for the general elections.
Friction snubber assembly with top bottom
Construction of Major Bridge on road from S.H.188 to Ajara Sawarwadi to join S.H.201, O.D.R.147 at Km. 1/300, Taluka-Ajara, Dist. Kolhapur
AMC to Gudawale Khamdale Here Sawarde Shippur Karanjgaon Halkarni road MDR 71 KM 0/000 to 19/100 Tal Chandgad, Dist kolhapur.
Sterile Disp. Syringe 5ml with Needle no. 23 x 1 inch as per specification sterile hypodermic syringes with attached needle for single use as per IS-12050-1986 as amended up to date as per sizes indicated under the schedule.
SIDE BUFFER 15 KJ Capacity for 3 phase or Conventional loco as per RDSO DRG. No. SKDL-4725. Warranty Period 30 months from the date of Supply.
Supply & Installation of mobile Industrial stair case with top landing base
Proposed work road S.t and B.t of road at S.T Colony from Namdev Ghokale ghar to Ashok Randive ghar in Gadhinglaj Muncipal Council Gadhinglaj
Proposed work of S.t and B.t of road and gutter at B.B.Patil Colony from Sandip Kagwade ghar to Nag Mandir Gadhinglaj Muncipal Council
Proposed work of Road asphalting at Khangave galli infront of Janaki Medical to Kiran Telvekar ghar and concrete gutter at Subhash Road infront of k.D.C.C Bank corner to Nandkumar Shetake shop in Gadhinglaj
Proposed work of 150mm concrete gutter at Khangave Galli from Janaki medical to Ravi Yesare Ghar in Gadhinglaj Muncipal council
Proposed work of 150mm concrete gutter at Khangavenagar internal road and concrete work at Regade boll from amar shetake ghar to Public toilet and pathway Paving block at Kadgaon road from M.R Highschool compound to Devarde Gharin Gadhinglaj Muncipal
Proposed work of Road asphalting at Nana nani park near infront of Ajit Mandekar ghar to Devarde Complex andS.t and B.t of road at near Water tank in Gadhinglaj Muncipal Council Gadhinglaj
Proposed work of One side of R.c.c gutter at Swarajya colony Ring road from Baburao Patil plot to Vishal Patil Plot in Gadhinglaj Muncipal Council Gadhinglaj.
Proposed work road S.t and B.t of road at Navnath nagar Third lane from Ananda Kumbhar ghar to Balasaheb Raval Ghar in Gadhinglaj Muncipal Council Gadhinglaj
Proposed work of Mangalewadi Gutter from Babu Mangale ghar to B.S.N.l Office and concrte gutter at Manglewadi from Bhairu Jadhav ghar to Avdut Kesarkar ghar and concrete gutter at Vadarge road Kadamwadi from Bhibisen Gourule ghar to Prashram Bad
Proposed work of 300mm concrete gutter at Potadar Layout from Jagdish Pattensetti ghar to Nala in Gadhinglaj Muncipal council Gadhinglaj
TOP ARCING HORN FOR TAP
Tractors (V1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3)
reserved for open category
reserved for open category
WORK NO. 3 - PRABHAG 68 KALAMBA FILTER HOUSE ANTARGAT NAIK GHAR TE CHODANKAR GHAR TE TURNING POINT APARTMENT COMPOUND TE KHEDEKAR GHAR GUTTER KARNE.
reserved for open category
reserved for open category