Loading…
Loading…
1,676 results • Latest
SITC of HAT AC Machine for department of Oral surgery at 6th floor at new campus of Dr. R. Ahmed Dental College and Hospital, Kolkata
Supplying, fabrication and installation of Modular Kitchen Unit and other items at the kitchen within Governor s suite, 2nd floor of Lok Bhavan Kolkata
OPERATION AND MAINTENANCE OF 60 MGD CAPACITY WATER TREATMENT PLANT, PHASE- II ON ROUND THE CLOCK BASIS AT GARDEN REACH WATER WORKS (GRWW) FOR A PERIOD OF THREE YEARS.(2nd call)
S.I.T.C of new Lift of suitable capacity in replacement of the existing old Lift in existing lift well and allied Electrical Installation work at G 10 storied Academic building within Alipore campus of University of Calcutta Electrical Installa
Supply, Installation, testing and commissioning of passenger lift and allied Electrical Installation work at front side of Bhabani Bhawan Main Building,Alipore,Kolkata 27 EI work.
Annual Maintenance Estimate of the Electrical Installation of Moulali Yuba Kendra-- Engagement of Lift operator cum attendent.