Loading…
Loading…
420 live275 closing this weekmost from Local Self Government Department and Irrigation Department
420 results • Latest
824-Manakkatumukku - ookkanmukku road maintanance in Sasthamcotta GP
757-Chunkathara - Appally road maintanance in ummannoor GP
679- Elanjikodu Angadi palam road maintanance in Ezhukone GP
Cost of Loping and working down seven trees standing at the sites where the batchelor quarters are proposed at Rosemala and Kalamkunnu in shendurney Wildlife Sanctury during 2026-27
GENERAL Action Plan 2026 27 Annual maintenance Desilting in Thrikkunnapuzha North distributory minor 1 minor 2 Thrikkunnapuzha South distributory minor 1 minor 2 minor 3 and minor 4 General Civil Work
GENERAL Action Plan 2026 2027 KIP O M Annual Maintenance work under the Section 13 4 Charummoodu Clearing jungle silt and floating body removal Pazhakulam distributory at Ch 0 to 1315 m and its minors General Civil Work
GENERAL ACTION PLAN 2026 27 KIP LBUrgent Rectification of Nellikkunnam Distributary between Ch 2800 m and 3100 m in Ummannoor Grama Panchayath General Civil Wor
Unloading/Unpacking/ Stacking of Raw Ilmenite received in KMML in Trucks / Trailers /Containers / other vehicles
Estimate for the cost of Constructing a Toilet attached to the Check Post, Karavoor under Pathanapuram Range during 2026-27-General Civil Work
PROCUREMENT OF SUPPORT ROLLER WITH SHAFT IN ASSEMBLED CONDITION FOR ROASTER / CALCINER
Conversion of 25 nos of open well into protected and sustainable drinking water source in poruvazhy, sooranadu north ,sooranadu south under package in kollam district
The proposed rectification works includes Chipping away unsound concrete applying bonding coat applying SBR polymer modified cement mortar for damaged shutter pier
Cost of renovation of Toilet Block in FIC Thenmala in Shendurney Wildlife Sanctury during 2026-27
GENERAL Premonsoon 2026 urgent removal of waste and debris from Kallada river near Makkulam in Pathanapuram Constituency General Civil Work
Proj. No 227/26-27. -Maintenance of Kanjaveli- Koottikada -Thottumukham Road , ward 15
Pr No 122/2026-27 Kannankara road maintenance ward 16 of Thrikkaruva GP
Proj no-228/27-UPS JUNCTION PAVOOR ELA ROAD MAINTANANCE W 5,7
Proj .No-229/27-Cherumannoor madam madhathil mukku road maintanance w-7,8
Proj no-230/27-INCHAVILA PAAVOOR ELA ROAD W-5 IN THRIKKARUVA GP
Proj no-225/27-Village office Vellarasery ela road concrete in w-3 Thrikkaruva GP
Proj.No 226/26-RENOVATION OF MUKKEL KADATHUKADAVU MUTHAL PUTHETHU MUKKU ROAD- MADHURASSERI MUKKEL ROAD IN WARD 12
PROJECT NO-224/27-VILAYIL MUKKU MULAKKAL ELA ROAD CONCRETE W-3 IN THRIKKARUVA GP
Proj No 223/26 Laksham veedu colony road Maintenance in ward 13 under Thrikkaruva GP
Annual Plan-Pr .No 109 Kurumbalamoodu nediyath road reTarring and side concreting of Thrikkaruva GP
Annual Plan-Pr No 111/2026-27 Anechuttamukku Elumala road ward 8 of Thrikkaruva GP
Annual plan -Pr No. 127/2026-27 Ammumma nada thekku road maintenance ward 17 of Thrikkaruva GP
Annual Plan-Proj No-117/26-Proj No-117/26 Bhavana mukku Cheppally kayalvaram road Maintanance w-2 in Thrikkaruva GP-
Annual Plan-Pr No.113/2026-27 Olikkara Chandakkadavu road maintenance of Thrikkauva GP -General Civil Work
Annual plan-Pr No.125/2026-27 Parattachira nirakathu road reconcreting ward 6 of Thrikkaruva GP
Annual plan -Pr No.123/2026-27 Poovattom mukku Pavoor ela road maintenance ward4 of Thrikkaruva GP
Annual plan-Pr No 126/2026-27 Janatha vayanasala Elumala road ward 8 , 9 of Thrikkaruva GP
THRIKKARUVA GP 2026-2027.Proj-119/27-Maintenance of Madathilmukku Thottuvayal Road in ward-14-General Civil Work
Annual Plan-CDLM G.P 228/26-27 Waterlogging preventive measures and other related works at Krishibhavan Compound
Annual Plan-CDLM G.P 234/26-27 PALLIMUKKU THOTTINKARA ROAD MAINTENANCE IN WARD 7
GENERAL-CDLM G.P.69/26-27 PALLIMUKKU MANALAYAM ROAD MAINTENANCE IN WARD 14
GENERAL-CDLM G.P 75/26-27 HOMEO HOSPITAL RENOVATION
Annual Plan-CDLM G.P. 242/26-27 AKKONAM MOOPPANKONATH ROAD IN WARD 7
Annual Plan-CDLM G.P. 232/26-27 PALOORKONAM NAGAR ROAD RENOVATION IN WARD 16
Annual Plan-CDLM G.P. 62/26-27 HIDAAYA CHADAYAMANGALAM ELA ROAD RENOVATION IN WARD 08
Annual Plan-CDLM G.P. 65/2026-27 -VETTUVAZHI KAVU ROAD MAINTENANACE IN WARD 12
Annual Plan-CDLM G.P. 77/26-27 VETTUVAZHI MUTTU KONAM ROAD MAINTENANACE IN WARD 12
Annual Plan-CDLM G.P.63/26-27 PERUPURAM KOCHALUMMOOD ROAD MAINTENANCE IN WARD 09
GENERAL-Action plan 2026- 27 - Annual Maintenance-Jungle clearance and Removing floating body for the smooth flow of water during water distribution in Pallickal Anayadi Thottuva distributory
GENERAL Action Plan 2026 2027 KIP O M Annual maintenance work under the section 13 4 Charumoodu Clearing jungle Silt and floating body removal for Nediyapadam South canal at Ch 0 to 9400 m General Civil Work
GENERAL Action Plan 2026 2027 KIP O M Annual maintenance work under the section 13 4 Charumoodu Clearing jungle Silt and floating body removal for Nediyapadam North canal from ch 0 to 7340m General Civil Work
GENERAL Action plan 2026 27 Annual Maintenance Jungle clearance and removing floating body for smooth flow of water during water distribution in Vallikunnam distributory from 0m to 6777m General Civil Work
GENERAL Karavaloor KIP Canal Road Work Rectification LBMC bund road work between Ch 14900m to 15600m General Civil Work