Loading…
Loading…
3,984 results • Latest
weeding in the oil palm plantation
WEEDING CHITHARA ESTATE A DIVISION FIELD NO. 5. CUTTING AND HEAPING OF THE WEEDS OF THE PLANTATION
DEPOSIT-CCTV EXTENSION Govt Medical College Paripally -Supply and Installation of Additional Cameras in Campus at Govt Medical College, Paripally-General Electronics Work
Purchase of Street light accessaries
DEPOSIT- CCTV at Various locations in Adichanaloor Grama Panchayath-Supply and Installation of CCTV at Various Locations in Adichanaloor Gramma Panchayath, Kollam District-General Electronics Work
Pro no 133 Nedumbayikulam kochu thazhathil kalayankulam road maintanance ward11 Ezhukone GP
Pro no 127 PUTHUSSERIKONAM VAYANASHALA EALA ROAD MAINTENANCE WARD 10 Ezhukone GP
Annual Plan Project no 131 KAADUNGAL VEERADAKAVE CHAALIL ROAD MAINTENANCE WARD 6 IN EZHUKONE GP
Estimate for the cost of Renovation of Section Office Building Kalamkunnu in Anchal Range during 2026-27- General Civil Work
PMC Maintenance of Rama Rao Hospital at Nedumgolamn Paravur Municipality General Electrical Work
DEPOSIT-WSS to Ummannoor Pt.-DepositJilla panchayath-Utility shifting of 150mm GI pipe for the culvert renovation work
DGR Empanelled ESM Security Services
DEPOSIT-Renovation of CHNM classroom and allied works in Women s ITI,Kollam-General Civil Work
Cost of Ecorestoration and 1st year maintenance of 2026 Bit I Eucalyptus plantation Piravanthoor in Amabanr Forest Station of Pathanapuram Range during 2026-27
Handling and Transport on Lumpsum Basis - Shifting, heaping, loading and transport the desilted sand from Azheekal harbour site to IREL plant at Chavara –For 50, 000 Tonnes, loading and transport the desilted sand from Valiyazheekal harbour site to IREL plant at Chavara – For 35
GENERALBudget Work 202324 Improvements and Providing BM BC to Kanam Chamampathal road at Ch00003200 Kanjirappara Kanam Road bwCh1350 1600 km Kanam Pathandu road at Ch00002000 kmBM amp BC WORKGeneral Civil Work1
GENERALBudget Work 202223 Substitution Improvements by providing 40 mm CChipping Carpet to Thettikkunnil Kshethram Vayalikkada Road Ch0000 to 1000General Civil Work2
GENERALUpgradation Works Budget works 2019 20 Nedumkunnam Attakulam Road from km 0000 to 5180 General Budget works Providing BM BC Balance work to ch 36805180 Deposit Work Restoration work on Nedumkunnam Attakulam road
OandM - Water Supply Schemes-KWSS to Meenad and adjoining villages.-Cleaning of used washwater tank at WTP,Panamkuttimala
Handling and Transport on Lumpsum Basis - Excavation, heaping, stacking of mineral sand, loading & Transportation of mineral sand from Pandarathuruthu area to IREL (India)Ltd Chavara plant on zero moisture basis - For 80000 T, Handling and Transport on Lumpsum Basis - Mechanical loading, Transportation and levelling of tails sand from IREL (India) Ltd Chavara plant to the excavated pits at Pandarthuruthu area on zero moisture basis - For 20000 T
OandM - Water Supply Schemes-KWSS to Meenadu and adjoining villages-Cleaning of Master Balancing Reservoir at Panamkuttimala
Annual plan-Proj no.63/26-27 Palavila school maintenance in ward 15-General Civil Work
GENERAL-Maintenance of quarter 4A in Asramam Police Quarters, Kollam-Maintenance of quarter 4A in Asramam Police Quarters, Kollam-General Civil Work
GENERALSabarimala Festival 202526 Improvements to Vallakkavadu Perumkulam Road By providing 40mm CC General Civil Work
(Retender)Annual plan-Proj 24/25 Maintenance of anganwadies 80 and 81 in ward 18
GENERAL Premonsoon works 2026-27 for all the assets except rest houses coming under Chathannoor Constituency Chathannoor-General Civil Work
GENERAL-Premonsoon 2026-Premonsoon Work for various bridges under Bridges section Karunagappally -General Civil Work
various bridges under Kollam Bridge Section 1- General Civil Work
(Retender)Annual plan-Proj 280/25 MCF building completion(Electrification)
Annual plan 2025-26-Proj no 68 RENOVATION OF KRISHI OFFICE -General Civil Work
Supply, installation, testing and commissioning of ICP- AES/OES at IRE-RC, Kollam
A(Electrification) Annual Plan-77/2025-26-Renovation of Subcentre and Electrification-SH Renovation of Subcentre ward 2 in Mynagappally GP-General Civil Work
OM Water Supply SchemesRWSS TO MYNAGAPPALLY PANCHAYATHReplacement of Old damaged75mm PVC Pipelinefrom south of Thondappuram Jn. to west Near Post no. MPY/KR/181/22/4 to Post no. MPY/KR/262/7/1 in Ward No.13- Pipeline Work
GENERAL Premonsoon works 2026 All asset buildings under PWD Buildings Section Kollam except Rest House work General Civil Work
Annual Plan-2025-26 Pro 283-Providing switchboard for water purification in anganwadis in Mynagappally GP
Annual Plan-2025-26 Pro 282-Convert mini conference hall to creche in ward 2 Mynagappally GP
Construction of 400kV GIS Substation at Edamon and associated Works
Sale of Cashew Kernels (IVC)
Annual plan-SO/133/25 Pochatharayilmukku Parayantayyathkulam road maintenance in ward 7 MNPLY
GENERAL-Pre-monsoon 2026-Clearing jungle in the Right bank of Kallada river near West Kallada Nelparakkunnu Kadavu and rear side of Govt LP School West Kallada -General Civil Work
DEPOSIT-Construction of Drain -Construction of wall for Villimangalam Muthiraparambu drain in the right bank of Puthanar(Part of Kallada River) in Mundrothuruth panchayath Kunnathur Constituency-General Civil Work
RENNOVATION OF HOMEO HOSPITAL
BEAUTIFICATION OF AYURVEDA HOSPITAL
Maintanance of anganwadies in karepra gp
MAINTANANCE OF NEDUMONKAVU UPS
COMPOUND WALL MAINTANANCE FOR St.THOMAS GLPS
ASARIVILAKAM MANNARVILA ROAD
MANAKKADU KARIKKAL PALLI ROAD