Loading…
Loading…
234 results • Latest
Construction of CC Road and Drain from NTPC Road to Dhanuar para concrete road at Ward No. 58
Construction of Cement Concrete Raod from Grihani Anaj to Poshan Shope at Ward No. 04 Ratakhar.
Construction of CC Road from 1. Billu Matware Home to Raju MAhanand Home , 2. Ramswaroop Home to Babalu Giri House, 3. Akku Home to Ramlal Ranne Home, 4. Nitu Yadav Home to Namdev Houem at Ward No. 49 Hasdev No. 2
Maintenance of Road form Main road Nilgiri Basti to Fertilizer Basti road at Ward No. 59 Darri Khar
Alloy steel round 45mm EN-8R, Alloy steel round 50mm EN- 8R, Alloy Steel Round 60 mm EN-8R, Alloy Steel Round 75 mm EN-8R, Alloy Steel Round 80 mm EN-8R, Alloy Steel Round 90 mm EN-8R, Alloy Steel Round 100 mm EN-8R, Alloy Steel Round 110 mm EN-8R, Alloy Steel Round 130 mm EN-8R, Alloy Steel Round 140 mm EN-8R, Alloy Steel Round 160 mm EN-8R, Alloy Steel Round 180 mm EN-8F&A, Alloy Steel Round 110 mm EN-24F&A, Alloy Steel Round 125 mm EN-24F&A, Alloy Steel Round 140 mm EN-24F&A, Alloy Steel Round 200 mm EN-24F&A, Alloy Steel Round 230 mm EN-24F&A, Alloy Steel Round 245 mm EN-24F&A, Alloy Steel Round 260 mm EN-24F&A
Induction motor (squirrel cage induction motor) 325KW, 6600V, non-flameproof, Induction motor (squirrel cage induction motor) 300KW, 3300V, Induction motor (squirrel cage induction motor, 250KW, non- flameproof, Induction motor (squirrel cage induction motor), 200KW, 125KW
Facility Management Services - LumpSum Based - Mines and Workshop; Work towards Assisting support service towards Daily, periodical, preventive and breakdown maintenance of 16 no BEML Dumpers at Gevra OCP for 365 days as per scope of work; Consumable..
EXTERNAL HARD DISK 4 TB, EXTERNAL HARD DISK 6 TB