Loading…
Loading…
1,277 results • Recent activity
LOTO KIT, Ladder FRP EXT Ended 12M F/Electrical use, Ladder 42FT AL Adjstbl, Hight Voltage Detector
Repair and maintenance of Rajgamar main magazine building at Rajgamar Subarea.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio Mahindra Scorpio N Mahindra XUV 700 TATA Harrier TATA Safari or equivalent; The age of vehicle shall not be more than 2 years from the scheduled date of opening of T..
100270390 WELDING M/C, PLASMA CUTTING, 120-150A
Day to Day Repair and Maintenance of residential qtrs. Of Korba Area.
Steel Tubes, Tubulars as per IS 1239 (Q3), Steel Pipes for Water and Sewage as per IS 3589 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6497955 Dated : 22-08-2025 Bid Document 1/15, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category Steel Tubes, Tubulars as per IS 1239 Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 198292500 Evaluation Method Item wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 138000 Schedule 2 EMD Amount (In INR) 87000 Schedule 3 EMD Amount (In INR) 402000 Schedule 4 EMD Amount (In INR) 65000 Schedule 5 EMD Amount (In INR) 1582000 Schedule 6 EMD Amount (In INR) 1692000 ePBG Detail Advisory Bank State Bank of India 2/15 (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 8 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : A Subsidiary of Coal India Limited, Ministry of Coal SOUTH EASTERN COALFIELDS LIMITED, A Subsidiary of Coal India Limited, Ministry of Coal, Bilaspur Cg, Materials Management, BANK NAME : State Bank of India BRANCH NAME - SME SBI Branch, Bilaspur NAME OF BENEFICIARY- SOUTH EASTERN COALFIELDS LIMITED, SEEPAT ROAD BILASPUR ACCOUNT NO: 30285470636 IFSC CODE-SBIN0004177 (South Eastern Coalfields Limited) Splitting