Loading…
Loading…
1,310 results • Recent activity
Repairing of existing road with WBM from Naraibodh chowk to TRS Laxman and making approach road from existing TRS road to Laxman workshop of Gevra Project of Gevra Area
Schedule1_100270076_10_T2289605103_SLING ROPE 10MM 12M_For Korba Super Thermal Power, Schedule2_100270076_20_M2293855811_SLING ROPE STL GALV 6X37 STL 10MM 10M_For Korba Super Thermal Power, Schedule3_100270076_30_T2293716033_SLING ROPE STEEL 6MM 3M_For Korba Super Thermal Power, Schedule4_100270076_40_T2293716060_SLING ROPE STEEL 6MM 6M_For Korba Super Thermal Power, Schedule5_100270076_50_T2293716103_SLING ROPE STEEL 8MM 8M_For Korba Super Thermal Power, Schedule6_100270076_60_T2291212456_SLING ROPE SINGLE LEG 12MM 5M_For Korba Super Thermal Power, Schedule7_100270076_70_T2293960283_SLING ROPE ROUND UNGALV 12MM 8M_For Korba Super Thermal Power, Schedule8_100270076_80_M2293850287_SLING ROPE STL RND 6X36 FC 25MM 8M_For Korba Super Thermal Power, Schedule9_100270076_90_M2291531197_SLING ROPE STL SGL LEG IWRC 7MT 30MM 7M_For Korba Super Thermal Power, Schedule10_100270076_100_T2289525308_SLING ROPE 32MM 10M_For Korba Super Thermal Power, Schedule11_100270076_110_T2293217059_SLING ROPE POLYESTER WEBBING 1MT 3M_For Korba Super Thermal Power, Schedule12_100270076_120_T2299735568_SLING ROPE POLYESTER 1TN 1 5M 3M_For Korba Super Thermal Power, Schedule13_100270076_130_T2293730219_SLING ROPE FLAT WEBBING 5TN 6M_For Korba Super Thermal Power, Schedule14_100270076_140_T2293723325_SLING ROPE 6X37 32MM 8M_For Korba Super Thermal Power
Cylinder Maintenance and Handling Service - Statutory testing & Painting(STP); Domestic; 14.2 Kg
Removal of spillage coal from the TB-1, TB-2, TB-3, 31LE 1st and 2nd belt, 28R belt, 30LE belt and 61D/30LE, 32L belt road way in G-III Top-Bottom Seam at Singhali UG Mine, DSB Sub Area
Installation of complete belt structure, Marching of LHD/UDM, laying of haulage track line, Pipeline and Erection of temporary stopping at Dhelwadih UG Mine.
Stamping of 04 nos. Pre-weigh hoppers of SILO 3 and 4 installed at KOCP.