Loading…
Loading…
85 results • Latest
Construction of Shed at ward no 15 Near Samlai Mandir naya baradwar
Construction of extra hall at nagar panchayat office ward no 11
Strengthening of RCC Foundations of the CHP and Belt Line at Churcha RO Sub Area Baikunthpur Area
Repair of DG set Foundation at Churcha (RO) Sub Area of Baikunthpur Area
Annual Anti Larval Spraying and Thermal Fogging in Residential Colonies of Churcha (RO) under Baikunthpur Area
Gravel Laying and Earthing pipe Connection at Katghori Substation, Churcha (RO) Sub Area of Baikunthpur Area
Preparation of marching route of proposed LHCM depillaring panel 16LS, 10LS, -16R and -9R in seam C at Kurja UG Mine.
Vermicompost (V3) Conforming to IS 16702 (Q2) (3 (3 ))
Construction of 07 Nos Isolation Stopping at 15LE proposed LHCM Panel of Seam II in Pandavpara Mine
Drilling of 22 nos NX size upward vertical borehole in proposed depillaring panel 16LS,10LS,-16R and -9R from seam C to seam A 18 nos and seam C to seam B Bottom 04 nos at Kurja UG Mine of Hasdeo Area for six month time period.