Loading…
Loading…
518 results • Latest
Construction of Balance Work of WSA at Ch 381.850 on Both Sides LHS and RHS of 8 Lane Carriageway of DVE NH 148N from Junction with SH 37A to Junction with NH 76 Ch 359.170 to Ch 388.420 Package 13 on Risk and Cost of Contractor on Item Rate Basis
Annual contract for capital and routine maintenance of boiler pressure part area (HP/LP welding of boiler/turbine area, HP/LP Valves, soot blowers and its associated works) of Stage-I to V( Unit 1 to 7) KSTPS, Kota
PVC Insulated (Heavy Duty) Electric Cables Marked To IS 1554 (Part 1) (V2) (Q2), XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
SUPPLY AND INSTALLATION OF GENERAL AND MEDICAL EQUIPMENT ALONG WITH PLUMBING WORK, ELECTRICAL AND CIVIL WORK FOR NEW I.P.D. AND NEW O.P.D. IN MBS HOSPITAL, KOTA ON TURN KEY BASIS
Paint Ready Mixed Brushing Bituminous Black Lead Free Acid Alkali Water and Chlorine Resisting to IS:9862-1981 Amdt No. 1 of July 1988 or latest. Packedin 20 liters New Non Returnable Sound M.S. Drum to IS:2552/79 Gr-BII. The date of supply of the material should be within 60 days from the date ofmanufacture. Spec:
Supply and AMC of Drones for Transmission Line Patrolling