Loading…
Loading…
4,312 results • Latest
CONSTRUCTION OF ESSENTIAL CIVIL INFRASTRUCTURE WORKS FOR 110/11KV SUBSTATION INCLUDING RCC OIL SUMP AND FIRE WALL BETWEEN FIRST AND SECOND TRANSFORMERS AT INDUSTRIAL RUBBER COMPLEX, VELLOOR, KOTTAYAM DISTRICT, KERALA.
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) ( ( 3 3 ))
Annual Plan-51/26-27 VELLOOR GP Maintanance Of Vettkattumukku Giriseenayi Road Ward 11
Annual Plan-43/26-27 VELLOOR GP Maintanance Of Chemanchi Ikkarakandam Road in Ward 2
Annual Plan-44/26-27 VELLOOR GP Maintanace Of Madathedam Thennaseri Road ward 3
Paper-based Printing Services - Printing with Material; Book/Booklet; Offset
Design, Supply, Installation and Commissioning of 8kWp Grid Connected SPV Power Plant at FHC Aymanam Valyad FHC, Kottayam District.
Design, Supply, Installation and Commissioning of 14kWp Grid Connected SPV Power Plant at CHC Thalayolaparambu, Kottayam District.
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
GENERAL RM 2026 27 RC 2 ZoneVOne year Running Contract for various PWD Roads under Road Section Pampady in Kottayam district 6 road stretches for a length of 27.365 km Running contract General Civil Work
GENERAL Reconstruction of damaged Culvert at Irumboozhikkara Road at Ch 0 350 civil work Investigation Work 1 PART TS
(RETENDER) Annual Plan-PRJ NO 92/26 OMALLOOR DRINKING WATER PROJECT IN WARD 5
(RETENDER) Annual Plan-PRJ 416/26 Manjoor GP Annex Building-Interlock paving and other allied works -KURUPPANTHARA SHOPPING COMPLEX RENOVATION
Annual Plan-2025-26 Kanjirappally Block (Project No 258/26)-Construction of Toilet for Njallamattam VEO Office-General Civil Work
Annual Plan-2025-26 Kanjirappally Block (Project No 253/26)-Construction of Toilet at Murikkumvayal Gov Vocational Higher Secondary School-General Civil Work
Annual Plan-2025-26 Kanjirappally Block (Project No 263/26)-Completion of Bridge Construction across Chittar River-General CivilWork
Annual Plan-2025-26 Kanjirappally Block (Project No 265/26)-Mundakkayam Family Health Centre Painting and Related works- General Civil Work
Annual Plan-2025-26 Kanjirappally Block (Project No 266/26)-Basic Facilities of Mundakkayam FHC-General Civil Work
Annual Plan-2025-26 Kanjirappally Block (Project No 252/26)-Maintenance of Block Panchayath Office-General Civil Work
Annual Plan-2025-26 Kanjirappally Block (Project No 250/26)-Motor and Related Activities for SH UP School Drinking Water scheme in Ponthenpuzha Division-General Civil Work
Annual Plan-Annual Plan-2025-26 Kanjirappally Block (Project No 245/26)- Installation of Biomedical Waste Plant at Mundakkayam Family Health Centre-General Civil Work
Annual Plan-63/26-27 VELLOOR GP Maintanance Of Thavalakulam Health Centre Road
Supply delivery assembly and installation of custom size
Renovation and Modernization of Existing Office of Deputy Director, Department of Tourism, Kottayam.
Renovation of Canteen and Kitchen at Office of Deputy Director, Department of Tourism, Kottayam.
Rectification of monsoon damage.
Annual Plan-Kanjirappally Block Panchayath Project No 101/26-Installation Of Motor for Anakkayam Drinking Water Scheme-General Electrical Work
Annual Plan-Kanjirappally Block Panchayath Project No 250/26-Pothenpuzha Division SH UP School Drinking Water Scheme Motor Allied-General Electrical Work
Annual Plan-2025-26 Kanjirappally Block (Project No 244/26)-Maintenance of Pump House at Mundakkayam Family Health Centre- General Civil Work
Annual Plan-2025-26 Kanjirappally Block (Project No 66/26)-Mundakkayam GP Karadimala Drinking Water Scheme-General Civil Work
Annual Plan-2025-26 Kanjirappally Block (Project No 55/26)-Basic facilities development of SC Sanketham in Ponthenpuzha Division- General Civil Work
Annual Plan-2024-25 Kanjirappally Block (Project No 32/25)-Basic Facilities to Chenappadi division SC Colony -General Civil Work
Renovation works of the Kerala State Cooperative Bank Regional Office Building Kottayam Phase II Civil Furnishing Electrical Air Conditioning Works of Ground Floor Second Floor Electrical work of Toilet Block
Clearing of water hyacinth
CROSS LAMINATED THERMOPLASTIC FUMIGATION (CLTF) COVERS
Urgent Removal of obstructions
XVFC SCHEME I (FY 2022-23-Construction of New Building for CHC Veliyanad in Alappuzha District (DSR 2021)
Entry and Mid Level Desktop Computer (Q2), Computer Printer (V2) (Q2)
Constructing New 11kV Line With Covered Conductor From Fish-Landing Transformer to Labour India (Work Deposit Capital in favour of ANTONY RAPHEL ( 2146442600008 )
Printing and Supply of Cloth lined Covers - Code 316
Supply and Installation of Furnitures to the School of Management and Business studies, MG University
The scope of work includes cutting dangerous branches of trees ,clearing jungle and other connected important work under building section Aluva (Aluva and Angamaly costituency )
GENERAL Overhead Fire Tank at Vazhoor Press Overhead Fire Tank at Vazhoor Press General Civil Work
Annual Plan-Vechoor GP-Project No 214/25 26-Construction of Madathikkari Bridge ward 1
Annual Plan-Vechoor GP-Project No 30/26-27 Maintenance of Pallipalam Cheruvally Sreekandeswaram road - Ward 11-General Civil Work
Annual Plan-Erattupetta Muncipality Project No 112/26-27-Safa Mulloopara Link road handrail construction ward 17 (2L)
Annual Plan-Erattupetta Municipality-Project no 426/2025-26 Completion of Shasthamkunnu Drinking Water Project ward 19