Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
6,462 results • Latest
Const of Bore well at ward 02 wanganpora Dahama-B
Installation of Borewell at war mohalla kukroosa nlo G Nabi War others
Installation of Borewell near Jamia Masjid Bungergund
Installation of Borewell Near Masjid Abu Bakar Punzwa-B
Const. of Bore well at Ougbal
Const of Borewell ward no 02 Badana Mohalla
Const of Borewell Lonepore Sheikh mohalla shalnard ward No 01
CONSTT OF BORE WELL NEAR JAMIA MASJID SHAREEF PUNZWA-A
C O Borewell NHO Shareef Din PIr Others ( W.No 1)
Installation of Borewell NHO Fatah Mohd Teli, Zahoor Ah Teli, Ishfaq Ah Teli, Jhanagir Ah Teli And others at Daril Bala ward 05
Constt of Borewell near Abdul Rashid Mir at Dahama Hassan Abad Block Ramhall
CONST OF FOOTPATH WITH R WALL FROM MAIN ROAD TO AJAZ AH MIR MARHAMA WARD NO 6
BATTERY STORAGE RACK
Construction of Bore Well NHO Bashir Ahmad Kumar S Late Gh Mohd Kumar, Mohd Muqbool Kumar at Wadipora
Supply of books to the Library of Government Degree College Handwara.
Coke-Blast Furnace (RINL) (In Metrictonne) (Q3)
CONSTRUCTION OF BOREWELL AT GAZRIYAL A
Const of Bore well near Sumo Stand Villgam-A
Const of Bore well NLO Hilal Ah Mir, Gh Rasool Shiekh, others at Shiekh Mohalla Villgam-B
Const of Borewells At Shumriyal
Const of Bore well at Bajard Mohalla NLO Mohd Sadeeq at Hafrada
Const of Borewell Nr Primary School Suchlayari Ward no 05
Const of borewell nr High School Hangnikoot
CONST OF FOOTPATH N MOHALLA YQOOB SHEIKH ZURHAMA WARD NO 6
Procurement of High Mast Lights at Different Spots for Block Hayhama
02 No RCC Pipes for drain at near the house of Gh Hassan Gojri and others at ward 01
Reconstruction/Repair of toilet blocks at Town Kupwara
Construction of Boundary Wall for GnB Girls Hostel Zangli Kupwara
Construction/Upgradation of Boniyar road at Dedikot
Construction of link road from Main Road to Mosh Dug Hundi
Volleyball Net (V2) Conforming to IS 3345 (Q3), Badminton Net (V2) Conforming to IS 3345 (Q3), Cricket Bat (V2) Conforming to IS 828 (Q3), Chess Board (V2) (Q3), Carrom Board and Accessories (V2) (Q3), Badminton Racket (V2) (Q4), Volleyball (V3) Conforming to IS 417 (Q4) 3 3
Repair and Renovation of Jail Superintendent Residence under maintenance and repair works of district Jail Kupwara for financial year 2026-27.
PDDSS2627100246--Augmentation of Sub-Stations for critically overloaded DTs in TREHGAM Constituency under SASCI 2026-27
Upgradation of high security by way of plastering from outer side under maintenance and repair works of district Jail Kupwara for financial year 2026-27.
Snow Clearance 26-27 of PIU Handwara Stage 13
Snow Clearance 26-27 of PIU Handwara Stage 12
Snow Clearance 26-27 of PIU Handwara Stage 11
Snow Clearance 26-27 of PIU Handwara Stage 10
Snow Clearance 26-27 of PIU Handwara Stage 9
NUTRITION ITEMS FOR ICDS
Snow Clearance 26-27 of PIU Handwara Stage 8
Snow Clearance 26-27 of PIU Handwara Stage 7
1 point 5 by 1 point 5 Square iron pipe for modification of Toyota Hilux, Iron angle 1 inch, Nut and bolt 3 inch with washer, Nut and bolt 5 inch with washer, 8 by 4 MS Sheet 3 mm thick, Hinge 2 inch, Flat patti 2 mm, Flat patti 3 mm, Welding rod, Fabrication of Mobile BP Post modification, Self screw 2 inch, Cutting blade bosch 4 inch, Throttle cleaner, Cutting blade bosch 14 inch
Snow Clearance 26-27 of PIU Handwara Stage 6
Development of Model Trek Route from Rampor Rajpora to Triumkhan/Lolab, Kandi Range Kamraj Forest Division under UT-CAPEX Budget 2026-27.
Repair of Cordless impact wrench, Repair of Battery charger, Refilling of Oxygen cylinder, Refilling of Acetylene cylinder, Repair of Fuel injector tester, Repair of Portable welding machine foldable, Repair of Heavy duty hydraulic trolley Jack 10 Ton, Repair of Heavy duty hydraulic trolley Jack 3 Ton, Repair of Wheel balancer single phase with 1 HP Motor, Wiring and electric connection for Telecom section, Wiring and electric connection for R and I Sec and B Veh Sec, Repair of Change over switch 63A
Repair of Differential assy of Ly 5 7 point 5 Ton Stallion, Repair of Propeller shaft assy of truck 2 point 5 Ton, Repair of Hub shaft assy of STLN 5KL WB, Repair of Propeller shaft assy of Truck 2 point 5 Ton WB 2 KL, Repair of Transfer case assy of Maruti Gypsy, All seat repair of LBPV Rakshak Plus
3 Pole isolator switch, Gasket cylinder head cover, Dual head lamp relay, Filter element oil, Combination switch, Suspension bush kit, Bearing front, Side view mirror assy, Fuel returning pipe, Spin on oil filter 80K
Snow Clearance 26-27 of PIU Handwara Stage 5