Loading…
Loading…
1,709 results • Latest
Yard Improvement & Layout correction in AMG Yard in the section of SSE/P- way/LKO-II under ADEN/LKO-I in the jurisdiction of Sr. DEN-I/LKO.
Provision of 10 KVA AT in connection of Interlocking of Level Crossing gates in the section of ADSTE/BSB of Lucknow Division.
Repair & Comprehensive Annual Maintenance Contract (CAMC) of IPIS Integrated Passenger Information System installed at Prayag (PRG) and Ayodhya Cantt (AYC) Railway Station (Make: FIEM) for Three years over Lucknow Division of Northern Railway.
Hand gloves electrical class-4, with 36 KV working voltage BIS/IEC approval certificate to be submitted by the bidder at the time of offer submission and Item to be supplied along with test certificate.
SUPPLY and INSTALLATION TESTING AND COMMISSION OF WATER LOAD BANK FOR LOAD TESTING OF 500kva 750 VOLT 3 PHASE DG SET OF POWER CAR AS PER ATTACHED ANNEXURE.
SPL REPAIR TO SEPTIC TANK AND SOAKAGE WELL AND OTHER CONNECTED WORKS FOR BLOCK NO 01 TO 03 AND 38 TO T-08 AND 45 AT GFA FAFA UNDER GE (WEST) LUCKNOW
COMPREHENSIVE MAINT TO GOVT MD ACCN OF SAL BAHADUR, PHURBA ENCLAVE AND ADJOINING AREAS UNDER AGE B/R-I UNDER GE (WEST) LUCKNOW
COMPREHENSIVE MAINT TO GOVT MD ACCN OF NIRBHAY VIHAR AND ADJOINING AREAS UNDER AGE B/R-I UNDER GE (WEST) LUCKNOW
Provision of CCTV surveillance system at 05 Parcel offices (GD, BST, GKP, STP, LMP) with 05 year AMC & Provision of Stainless Steel dustbin with grouting & Furniture in Baby Feeding corner at stations.
NER-LJN Division:- Improvement of Electrical Sub Station buildings at BNY , BMJ , UB , CIH & SOT stations, upgradation of pannel room & rest room etc. at SUBR, ITE, GAW, TLR, PPW, BNY, PRZ, SOT, CIH & SDDN, Provision of Store room for commercial department (size 3x4 m) at TLR & BLP stations, Construction of TI office at BNY, provision of standard Tactile guide/pathway at PPW, JKNI & SUBR platform and construction of gang rest room at 12 locations under jurisdiction of Sr.DEN-HQ/LJN.