Loading…
Loading…
11 live8 closing this weekmost from Department Of Panchayati Raj and Urban Development & Housing Department Bihar
11 results • Latest
High Mast Lighting Towerforlargeareawith LED Flood Lighting System (Q3)
Construction of 620 Capacity Atal kala Bhawan in Madhubani District for the year-2026-27 (With electrification work)
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Potable Water Purification System DE-Ionization Based (Q3)
Potable Water Purification System DE-Ionization Based (Q3)
Annual repair and maintenance of non residential buildings at 18 Bn Hqrs SSB Rajnagar under SHQ Purnea
Custom Bid for Services - Work on a Design Supply Installation Testing and Commissioning of the Programmable Fountain at the memorial near Shanti Nath Temple in ward No 24 under the Jhanjharpur Municipal Council Similar Category Design Installation and Maintenance of Educational Lab/Centre
Revolving Chair (V5) (Q2), Desk and Bench Set for Classroom/Training Area (Q2), Steel Almirah/Cabinets (V4) (Q2), Metal Shelving Racks (Adjustable Type) conforming To Is 1883 (V2) (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2), Metal Storage Cabinet (Q2)
Comprehensive operation and maintenance and Special repair of 110 Nos Ward level Piped Water Supply Schemes (Non Quality) & 16 nos PWS Scheme based on item rates; constructed by the Public Health Engineering Department including payment to the pump operators, electricity bill for five years. No. of schemes: WLS(Non Quality): 110 PWS(Non Quality): 16 P H Division Jhanjharpur
Tablet Computer (V2) (Q2)