Loading…
Loading…
7,973 results • Latest
Annual Plan-Project No 28/26-27 Improvement works to theril idavazhy vattapparamb road in ward No 2 In Marakkara GP
VI WORK AT VALAPPIL ROAD under Electrical Section Pulikkal
Annual Plan-2026-27 Wandoor GP Proj No-229/27-Kovilakam kolamkolli road concreting in ward 24-General Civil Work
Construction of Matsyafed Deisel Bunk at Tanur Civil works
Annual Plan-Project No 51/26-27 Interlocking works to Moorkanaad Ambalam road in ward No15-In Marakkara GP
Annual Plan-2026-27 Perinthalmanna BlockPanchayath Pro No 29/27-KoyappadiOdakkulam Road Renovation in Alipparamb GP
Annual Plan-Project No56/26-27 Interlocking works to Kallayippadi Moorkanad road in ward No15-In Marakkara GP
Annual Plan-Project No 60/26-27 Interlocking works to Putheri Mohandas road in ward No 16-In Marakkara GP
Annual PlanProject No17/2026-27-Perinthalmanna Block Panchayath-MundolaManikkaparamba Road Renovation in Thazhekkode Grama Panchayath
RE-TENDER GRAMAPANCHAYATH OFFICE MAINTANANCE
Annual Plan-Project No 190/26-27 Interlocking works to Chattinirapp Embranthirippadi road in ward No16-In Markkara GP
Kavanur GP 2026-27 Proj No 118 ANAPRACHAL ANGANVADI MAINTENANCE WORK Center No 119
Annual Plan-Project No 200/26-27 Tarring works to Koottadammal Chandramohanan road in ward No17 In Marakkara GP
Annual Plan-Project No 202/26-27 COncreting works to Mangaattuchola thazhe chola kund road in ward No17-In Marakkara GP
Stringing HT ABC and Installation of 100 kVA DTR at Eravimangalam under Electrical Section Perinthalmanna
Maintenance of Chakkikuzhy Forest Station building under Chakkikuzhy FS of Kalikavu Range under Nilambur South Division
HT RE-CONDUCTORING AND INTERLINKING FROM KUZHICHITTAKALLU TO CHEMMANTHATTA USING COVERED CONDUCTOR under Electrical Section Pattikkad Chungam
CIVIL
DEPOSIT-IHRD-Construction of the new academic block of CAS Vattamkulam- IHRD-Construction of the new academic block of CAS Vattamkulam-General Civil Work-1
DEPOSIT- Balance work -Kottakkal Smart Village office -Revenue Dept-Scheme 2022-23 Providing truss work and construction of compound wall to the Smart Village Office Kottakkal-General Civil Work-1
Annual Plan-Project No 86/26-27 Concreting works to Kallanpadi road in ward No18-In Marakkara GP
Annual Plan-Project No 152/26-27 Tarring works to Edakkuda Shiva kshethram road in ward No 24 -In Marakkara GP
Annual Plan-Project No 63/26-27 Concreting works to Nimmini paramb road from Parappoor MLA road in wrd No9-In Marakkara GP
VI Work at Kuttiprathodi under Electrical Section Makkaraparambu
Annual Plan-Project No 142/26-27 Concreting works to Kaavungal padi Kakkaatt tholdika road in ward No 8-In Marakkara GP
Annual PlanProject No 32/27)-Keezhattur ChundappalliRoad Renovation in Keezhattur GP
Annual Plan-Thrikkalangode GP 2025-26 Project No.229-Puthankulam Road Concrete Ward 22-General Civil Work
Annual PlanProject No27/2026-27-Perinthalmanna Block Panchayath PooppalamK u n n a t h p a d i r o a d R e n o v a t i o n i nAngadippuram Grama Panchayath
DR Dumping-Extension of guide wall on the downstream of Chamravattom RCB-General Civil Work
Construction of Additional 11 kV Feeder from Malappuram 110 kV SS to Panayi using ABC under Electrical Section Anakkayam
Annual PlanProject No 145/26)-Kannathumchola Thodu SideProtection in Alipparambu GP
SITC of 7 Mtr Solar Mini Mast with 3 Nos 50W LED Flood light at Chellankode ST Unnathi Concrete Footpath, Ward-9, Muppainad Grama Panchayath under MPLADS of Sri PP Suneer MP (RS)
Annual Plan-2025-26 Perinthalmanna BP (ProNo-138/27)-Renovation and Electrificationworks to VEO office building in AngadipuramGP
Annual Plan-2026-27 Wandoor GP Pr No-396/27-Aripumad SC Road Resoration ward 24-General Civil Work
GENERAL KRISHIBHAVAN ROAD RKARA
Annual Plan-2026-27 Perinthalmanna BP (ProNo 148/27) -Vazhangod Kanyala Road SideProtection in Keezhattur G P
VI Work at Padinjarekkara Karinjappadi under Electrical Section Puzhakkattiri
This proposed building has Two floors with 3 class rooms staircase and Head room . Foundation proposed to G plus 2 Stories .The total plinth area is 307.28sqm .The footings are considered Isolated footing etc
Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ))
Annual Plan-PULIKKAL GP ANNULAL PALN 2026-2027 Pulikkal High School Road Renovation In Ward 21 -PROJ138/27-General Civil Work
GENERAL-Health and Family Welfare Department-Implementation of Annual Plan Scheme for 2022-23 Ensuring Fire safety Guidelines in all Medical Colleges -Setting up of fire safety system in C Block of GMC Manjeri- Electrification
Annual Plan-PULIKKAL GP 2026-2027 Alungapadi Anganavadi Road Concrete Ward 15 -PROJ102/2026-27-General Civil Work
Annual Plan-2026-27 Wandoor GP Pr 149/27-Nellikunnu Pulimadakkal Road Concrete in ward 14-General Civil Work
Annual Plan-2026-27 Wandoor GP Pr No-387/27-Cheerapadi road concrete in ward 21-General Civil Work
Annual Plan-2026-27 Wandoor GP Proj No-198/27-Mundani ashraf padi road completion in Ward 13-General Civil Work
SITC of 8 Mtr minimast with 5 no of 150W LED flood lights in the premises of the new building of Kuthuparamba Taluk Hospital, Kuthuparamba Municipality
Annual Plan-2026-27 Wandoor GP Proj No-382/27-Kunjalikutty Mash Padam Road Restoration in Ward 15-General Civil Work
Annual Plan-2026-27 Wandoor GP Proj No-376/27-Kottampara footpath interlock in Ward 12-General Civil Work
Annual Plan-2026-27 Wandoor GP Pr No 224/27-Thwahir Pattikadan basheerpadi road construction (side protection) in ward 17-General Civil Work
Annual Plan-2026-27 Wandoor GP Proj No -219/27-K P Anoop Padam Road Concrete in Ward 10-General Civil Work