Loading…
Loading…
358 results • Latest
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 25 m3hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Tube Well No. 4 of Gun Sankrul Wate
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 30 m3hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Dakshin Mahendrapur Water Supply Sc
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40 m3hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Sadlichak Water Supply Scheme of Ha
Augmentation work of OHR, Pump House and Boundary Wall of Belungaon Water Supply Scheme at Chanchal-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Paschim Bhagabanpur Water Supply Scheme under Chanchal-I Block under Malda Division, PHE Dte. in the district of Malda. (2nd Call)
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 90 m3hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Bamangram Water Supply Scheme of Ba