Loading…
Loading…
10,209 results • Latest
Implementation of the provision of wheel-wise load measurement in 140 Ton EIMWBs at BHW, BLPS, BKLE, SSGS, SBG and SGG through OEM on a single tender basis (Including Legal Metrology recertification arising due to the above modification work).
Installation of High Mast Tower Light
Installation of High Mast Tower Light
Installation of High Mast Tower Light
Installation of High Mast Tower Light
Installation of High Mast Tower Light
Installation of High Mast Tower Light
Installation of High Mast Tower Light
Replacement of damaged Motor Protection Relay for LTPDB Panel at High Lift Pumping station of Dariapur WTP within Malda Arsenic Area Water Supply Scheme (Southern Sector) under Malda Mechanical Division, PHE Dte.
Renovation of Dormitory at 1st Floor along with Roof Shed and Staircase at Amrapali Tourism Property.
Replacement of vacuum pumping machinery and other allied works at Raw water pumping station of Sankaritolaghat Intake Point within Malda Arsenic area W/S scheme (Northern Sector) under MLMD, PHE DTE.
Upgradation of Gazol Rural Hospital to State General Hospital or District Hospital, Gazole RH, Malda - SITC of Online UPS
i) Electrical work in c/w "Construction of subway in lieu of LC gate no 8/spl at Km 286/5-6 in bet stn GGA-LLM in SBG-BGP section of Malda Division." ii) Electrical work in c/w "Construction of Subway in lieu of LC gate no 2A at Km 314/9-315/0 bet stn NAT-AKN in BGP-JMP section of Malda Division." iii) Electrical work in c/w "Construction of subway in lieu of LC gate no 2 at Km 316/7-8 in bet stn NAT-AKN in BGP-JMP section of Malda Division." iv) Electrical work in c/w "Construction of subway in lieu of LC gate no 7 at Km 325.636 in bet stn AKN-SGG in BGP-JMP section of Malda Division." v) Electrical work in c/w "Construction of subway in lieu of LC gate no 11 at Km 331.629 in bet stn SGG-GNNA in BGP-JMP section of Malda Division." vi) Electrical work in c/w "Construction of subway in lieu of LC gate no 29 at Km 41/14-15 in bet stn BHLB-PJLE in BGP-MDLE section of Malda Division."
i) Electrical work in c/w "Construction of subway in lieu of LC gate no 16 at Km 351/8-9 in RPUR yard in BGP-JMP section of Malda Division." ii) Electrical work in c/w "Construction of subway in lieu of LC gate no 16/spl at Km 361/6-7 in bet stn JMP-DRTP in BGP-JMP section of Malda Division." iii) Electrical work in c/w "Construction of subway in lieu of LC gate no 17/spl at Km 362/7-8 in bet stn JMP- DRTP in JMP-KEU section of Malda Division." iv) Electrical work in c/w "Construction of subway in lieu of LC gate no 23 at Km 377/9-378/0 in bet stn MSDN-AHA in JMP- KEU section of Malda Division." v) Electrical work in c/w "Construction of subway in lieu of LC gate no 26 at Km 382/6-7 in bet stn AHA-KJH in JMP-KEU section of Malda Division." vi) Electrical work in c/w "Construction of subway in lieu of LC gate no 27/spl at Km 386/4-5 in bet stn AHA-KJH in JMP-KEU section of Malda Division." vii) Electrical work in c/w "Construction of subway in lieu of LC gate no 34/spl at Km 400/0-1 in bet stn DNRE-KEU in JMP-KEU section of Malda Division."
Construction and installation of water submersible near the Abdul Hai House at Udaypur S XXII under Mashaldaha Gram Panchayat.
Sinking of Sub mercible pump near the house of Habibur Rahaman S/O- Afajuddin at Batna under Chandmoni-II G P , Ratua-I Dev. Block
Sinking of Sub mercible pump near the house of Kamruljaman S/O- Yesin under Chandmoni-II G P , Ratua-I Dev. Block
Construction cement concrete road from c c road to the house of Tofajul ( 55 X mtr X 3.00 mtr) at Batna under Chandmoni-II G P, Ratua-I Dev. Block
Construction of Cement Concrete road from the house of Bablu towards the house of Amirul at village Bangabati (90M X 3M X 0.125M) under Chandmoni-I G.P., Ratua-I Block
Installation of Solar Light near of the house of Niyamat at Gobindajot Jame Masjid more under Chandmoni-I GP, Ratua-I Block
Installation of Solar Light near of the house of Muntaj at Gobindajot Jame Madrasah more under Chandmoni-I GP, Ratua-I Block
Repairing of road with piling work from the house of Habibur towards house of Abdul Basir Ration Shop at Bangabati (70M lenth piling) under Chandmoni-I GP, Ratua-I Block
Construction of C.C road from the house of Mahatabuddin towards the house of Affar at village Bangabati (30M X 2M X 0.125M) under Chandmoni-I G.P., Ratua-I Block
Construction of Cement Concrete road from the house of Samayun towards Existing C.C road at village Bangabati (30M X 2M X 0.125M) under Chandmoni-I G.P., Ratua-I Block
Construction of C.C road from the house of Amirul, S/o-Jakir Hossain towards Existing C.C road at village Bangabati (30M X 2.1M X 0.125M) under Chandmoni-I G.P., Ratua-I Block
Installation of Tube-Well near house of the Obaidur at Bangabati under Chandmoni-I GP, Ratua-I Block
Installation of Solar Light at Bangabati Graveyard under Chandmoni-I G.P., Ratua-I Block
Renovation of Electrical works with Replacing Damaged Old Electrical Wiring Line Along with Supply of AC for upgradation of lab for NABL accreditation purpose at State Seed Testing Laboratory Malda-E.I. work and Installation of AC machines
Installation of Solar Submersible Pump (2HP) infront of the house of paresh mandal at nangrashimul under Gazole Dev. Block of Malda District.
Installation of Solar Submersible Pump (2HP) beside of the house of bolai biswas, s/o- chhanu biswas at bilkanchan under Gazole Dev. Block of Malda.
Construction of Dais, Gallery, Boys and Girls Toilet, Surface Drain, Boundary wall and Ground Development of Samsi College Ground in the District of Malda, under Malda Division PWD, during the year 2025-2026.
Installation of Solar Submersible Pump (2HP) near Burima Mandir at Uttar Rampur under Harischandrapur-I Dev. Block of Malda District.
Installation of Solar Submersible Pump(2HP) near Chaytanna Mandal House at Janiki Nagar under Harischandrapur-I Dev. Block of Malda District.
Installation of Solar Submersible Pump (2HP) near Dipak Roy House at Tati Para under Harischandrapur-I Dev. Block of Malda District.
Installation of Solar Submersible Pump (2HP) near house of Nitish Barman under Habibpur Dev. Block of Malda District.
Installation of Solar Submersible Pump (2HP) near house of Pandab Barman under Habibpur Dev. Block of Malda District.
Hiring of 1 (One) no. Air-conditioned diesel driven Maxi Cab of engine capacity more than 2000 CC with commercial Registration on monthly rate basis for the official use of the Superintending Engineer, Northern Circle, P.W.D., Mangalbari, Malda.
Installation of Solar Submersible Pump (2HP) at Chachi Chandi at Chandi Mandir under Habibpur Dev. Block of Malda District.
Installation of Solar Submersible Pump (2HP) near house of Shibu Soren under Habibpur Dev. Block of Malda District.
Installation of High Mast Solar Light
Installation of High Mast Solar Light
Installation of Solar Submersible Pump (2HP) near Mahabir Mandals House under Manikchak Dev. Block Malda.
Installation of Solar Submersible Pump (2HP) near Madan Mahatos House under Manikchak Dev. Block Malda.
Installation of submersible pump for drinking water
Installation of Solar Submersible Pump (2HP) near Surjapura S.S.K under Harischandrapur-II Dev. Block of Malda District.
Installation of Solar Submersible Pump (2HP) near Bhairabpur Primary School under under Harischandrapur-II Dev. Block of Malda District.
Tab/Cap Methionine, Choline, Inositol and Vitamins [ ITEM CODE M200109] as per Specn. AI 26-27.
Installation of Solar Operated Light Duty Tubewell (3HP) for Minor Irrigation scheme for Amal Krishok Samity under Habibpur Dev. Block of Malda Dist
Installation of Solar Operated Light Duty Tubewell (3HP) for Minor Irrigation scheme for Ramen Krishok Samity under Habibpur Dev. Block Malda Dist
Installation of Solar Submersible Pump (2HP) near Taposh Roy House at Nolbari under Harischandrapur-I Dev. Block of Malda District.