Loading
Loading…
Loading…
331 results • Latest
Construction of Retaining wall at RDs 3/875 to 3/900)
Prep. of FCA with incl. online subm.) 1. Leda Ghangnoo road km 0/0 to 10/00. 2. Halyatar Gushali road km 0/0 to 8/400. 3. TPTS road km 11/00 to 22/645. 4. Majhyali Ghour Sardhwar road km 0/0 to 14/00. 5. Kapahi Jhor Palahi road km 0/0 to 4/0.
SH- Construction of PCC Retaining wall with 1-5-10 at RD 10/660 to 10/673.50)
SH- C/o aluminum partition, ceiling and Anti static vinyal flooring in 3rd Floor VRDL Lab in Medical College building).
C/o PCC approach wall upstream Nalwari side and downstream Kandhi side for slab culvert at RD 2/135) under MMGSY.
C/O Gabion Cate wire R/wall at RD 11/650 to 11/662