Loading
Loading…
Loading…
332 results • Latest
Replacement of damaged drinking water pipe line from backside of switchyard to switchyard control room, switchyard toilet, store toilet leading upto STP at BBMB Slapper.
Renovation of 2 nos. rooms of field hostel at BBMB colony, Slapper.
SH Renovation of old toilet etc
SH Providing roofing, tiles flooring and W.S and S.I works etc.)
SH Dismantling of old slab and P/L tiles flooring and W.S and S.I etc
SH Demolishing and providing sanitary fittings, flooring, tile work, aluminum work, distempering and other minor repair work in crew rest room toilet block