Loading…
Loading…
493 results • Latest
Complete Tube bundle 07-E-09, Tube bundle 07-E-103, COMPLETE TUBE BUNDLE FOR 308-E-3, TUBE BUNDLE 308- E-01A, TUBE BUNDLE 308-E-01B
Kit for Poly Urethane (PU) Constant Contact Side Bearer pad (3-Ring) for CASNUB 22HS Bogies (Design-A) consisting of four items (1) Round Plate Qty-02 no. (2) PU lining (set of 2 no. liners) Qty-01 set. (3) Poly rings Qty-03 no. (4) Stopper Spring (embedded to round plate) Qty-02 nos. as per firm's own RDSO approved drawing fit within the dimensional envelope specified in RDSO Drawing No. WX- 04057 Alt-1 and shall comply with all other stipulations mentioned therein. Material as per drawing and conforming to RDSO Spec WD-38-Misc-2004 (Rev-3) of Apr-25.
PRIMARY VERTICAL DAMPER FOR TRAIN-18, EMU US & MEMU US COACHES TO DRG.NO. (727)TRAIN18/MC/AC-0-1-009, ITEM-1, ALT 'c'--- AND IN COMPLIANCE TO RDSO specification RDSO/CG18005, Rev-02 (or Latest)---- OR EN-13802 (LATEST REVISION). 1. FIRM HAS TO SUBMIT OEM DRAWINGS WITH DETAILED DIMENSIONS & CHARACTERISTICS. 2. TYPE TEST SHALL BE CONFORMING TO RDSO CG18005 (LATEST REVISION) OR EN-13802. 3. SERVICE TRIALS SHALL BE AS PER RDSO CG- 18005 (LATEST REVISION). Special Condition : 1. PROTO TYPE SAMPLE (INCLUDING TYPE TEST)TO BE GOT APPROVED FROM ICF BEFORE MANUFACTURING FOR BULK SUPPLY. 2. THE FIRMS WHO HAVE ALREADY SUPPLIED THE SAME ITEM NEED NOT GET FRESH PROTOTYPE APPROVAL.
SECONDARY VERTICAL DAMPER FOR TRAIN-18, EMU US & MEMU US COACHES TO DRG. No.TRAIN18/MC/AC-0-5-010, ITEM-1,ALT-'c'---- AND IN COMPLIANCE TO RDSO SPECIFICATION RDSO/CG- 18005, Rev-02(or Latest)---- OR EN-13802(LATEST REVISION). 1. FIRM HAS TO SUBMIT OEM DRAWINGS WITH DETAILED DIMENSIONS & CHARACTERISTICS. 2. TYPE TEST SHALL BE CONFORMING TO RDSO CG- 18005 (LATEST REVISION) OR EN-13802. 3. SERVICE TRIALS SHALL BE AS PER RDSO CG- 18005 (LATEST REVISION).
SECONDARY LATERAL DAMPER FOR TRAIN -18, EMU-US & MEMU US COACHES TO DRG.NO.TRAIN18/MC/AC-0-5-011, ITEM-1, ALT 'b'---AND IN COMPLIANCE TO RDSO SPECIFICATION RDSO/CG-18005--- OR EN-13802 (LATEST REVISION). 1. FIRM HAS TO SUBMIT OEM DRAWINGS WITH DETAILED DIMENSIONS & CHARACTERISTICS. 2. TYPE TEST SHALL BE CONFIRMING TO RDSO CG-18005 (LATEST REVISION) OR EN-13802. 3. SERVICE TRAILS SHALL BE AS PER RDSO CG - 18005 (LATEST REVISION)
Work of ACDB Panel, LT Cable and Related Work of Auxiliary Supply at 220 KV S/S Meetai under ETD Hathras