Loading…
Loading…
354 results • Latest
Comprehensive Chemistry 10 Parameter Clip set for 12 clip, Progesterone Test Slide set for 6 slide, Calcium Test Slide set for 12 slide, Inorganic Phosphate Test Slide set for 12 slide, Total Bilirubin Test Slide set for 12 slide, Amylase Test Slide set for 12 slide, Creatinine Test Slide set for 12 slide
WARD 12 KABRISTAN WALI INTERLOCKING ROAD SE KYUM KAI MAKAN TAK RCC DRAIN VA SLABE INTERLOCKING ROAD NIRMAN KARYA
Construction of RCC drains, RCC slabs, and interlocking roads in Ward No. 01 specifically from Satyanam Vidya to Ashraf house,and from the interlocking road to Sangam Gautam house and Chand house
Construction work for an RCC drain, RCC slab, and interlocking road in Ward No. 13, extending from Ramanand Tripathi house to Sharik house via Sunita Mishra house
Construction of an RCC drain, RCC slab, and interlocking road from Amit Kumar Verma house to Santosh house in Ward No. 03
Construction work for an RCC drain, RCC slab, and interlocking path at Ward No. 08, Banki Police Outpost
Construction of RCC drains, RCC slabs, and interlocking roads in Ward No. 02, spanning the route from Ajay Kashyap house to Lala Kashyap house, from Umesh Kashyap house to Shiv Kumar house, and from Shiv Kumar house to Tej Bahadur house
REPAIR/ MAINT OF PLASTERING, FLOORING, PERIODICAL SERVICES, SANITARY FITTINGS AND MISC B/R WORKS AT SUBSTATIONS IN SOUTH AREA AND DABATHWA AREA UNDER GE (U) MEERUT CANTT.
HALF-YEARLY MAINTENANCE, ON/OFF OPERATION AND SAFETY WORK OF STREET LIGHT SITUATED IN SECTOR- 2 AND 3 AT JAGRATI VIHAR EXTESION SCHEME NO.-11, MEERUT
HALF-YEARLY MAINTENANCE, ON/OFF OPERATION AND SAFETY WORK OF STREET LIGHT SITUATED IN 45 METER INNER RING ROAD SECTOR-8 AND 5 AT JAGRATI VIHAR EXTESION SCHEME NO.-11, MEERUT