Loading…
Loading…
1,258 results • Latest
21. The construction of Health Sub Centre at Gram Panchayat Baskop.
20. The construction of Health Sub Centre at Gram Panchayat Naidi Kothari.
17. The construction of Health Sub Centre at Gram Panchayat Narayanpur.
16. The construction of Health Sub Centre at Gram Panchayat Gogav.
15. The construction of Health Sub Centre at Gram Panchayat Newarhiya.
14. The construction of Health Sub Centre at Gram Panchayat Amoie Purawa.
13. The construction of Health Sub Centre at Gram Panchayat Gaura.
12. The construction of Health Sub Centre at Gram Panchayat Nagwasi-1.
11. The construction of Health Sub Centre at Gram Panchayat Chhataripur
10. The construction of Health Sub Centre at Gram Panchayat Thanipatti.
9. The construction of Health Sub Centre at Gram Panchayat Balapur.
8. The construction of Health Sub Centre at Gram Panchayat Akhodhi Katawapur.
7. The construction of Health Sub Centre at Gram Panchayat Khamwa Jampti.
6. The construction of Health Sub Centre at Gram Panchayat Jangal Mahal.
5. The construction of Health Sub Centre at Gram Panchayat Babhani.
4.The construction of Health Sub Centre at Gram Panchayat Devariya Rampur.
3. The construction of Health Sub Centre at Gram Panchayat Mohiddinpur.
2. The construction of Health Sub Centre at Gram Panchayat Bhaiepur Khurd.
1. The construction of Health Sub Centre at Gram Panchayat Ledoo.
Roti Making Machine, Portable Power Generators, commercial washing machine with dryer
Design Installation and Maintenance of Educational Lab/Centre - Vocational Lab; As per Bid; Buyer
Fabrication, Providing and Installation of 400 KVA SERVO Stabilizer, 3 Phase, 415 Volts at Ramraipur Pump Canal.
Construction of Brick Channel in Feeder Canal (Reach 0.300 Km to 0.560 Km) At Deegh Pump Canal.
Construction of Brick Channel in Feeder Canal (Reach 0.00 Km to 0.250 Km) At Deegh Pump Canal.
Contruction of Boundary Wall At Deegh Pump Canal
Tractors (V3) (Q2)
Interlocking work
Construction of CC road and drain
Construction of CC road and drain
Vikash Khand ke gram Sabha Tonga Hinota road se Jida ma Shitala Mandir tak interlocking ka work
Vikash Khand City ke gram Panchyat Chitiqj Maurya Basti me Kalesh Maurya ke ghar lalta ke ghar tak interlocking ka work
vikash Kand ke gram Sabha duhava me men road se Shankar maurya ke ghar tak Interloocking ka work
VIKASH KHAND KE GRAM SABHA BADHAPUR ME ASHVANI SINGH KE MAKAN SE HOTE HUYE RAMESH SINGH KE MAKAN TAK INTERLOOCKING KA WORK
VIKASH KHAND PAHADI KE GRAM BELVAN KAHUAA KE PATEL BASTI ME MUNNA PATEL KE GHAR SE HARIRAM PATEL KE GHAR TAK INTERLOOCKING KA WORK
Vikash Khand City ke gram shabha basuhi divari me jatashankar tivari ke Boundari se laker Krishandat Tivari ke ghar ke pas Shivar aur interlocking ka work
vikash kand City ke Sahaj marg Spirituality Foundation Piparadad mirzapur ke Aashram Parisar me Interloocking ka work
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Catering Service per Packet based - Veg; Snacks/High; Snacks Packet
Incresing Capacity of Semradh Bhadohi
Incresing Capacity Devri Uttar Mirzapur
1-W90310768136-ADANI-EXTRACTION PIPING A1 FOR 800MW SCOPE: CBOM NO. 01076832000, VAR-00, DRG NO. 010768, 2-W90310769108-ADANI-EXTRACTION PIPING A2 FOR 800MW SCOPE: CBOM NO. 01076932000, DRG. NO. 01076, 3-W90310770092-ADANI-EXTRACTION PIPING A3-LP1 FOR 800MW: SCOPE: CBOM NO. 01077032000, DRG. NO. 0, 4-W90310870011- ADANI-EXTRCATION PIPING A3-LP2 FOR 800MW: SCOPE: CBOM NO. 01087032000, DRG. NO., 5- W90310773016-ADANI-EXTRACTION PIPING A4 FOR 800MW SCOPE: CBOM NO. 01077332000, DRG. NO. 0107, 6-W90310775043-ADANI-COMPENSATORS FOR CASING GUIDE SCOPE: BOM 11077558000, VAR-00 DRG. NO. 11077558000
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
GP SHAHPUR, BARJIMUKUNDPUR, DUHAUA, SIRSI, PADARA KE GAUASHRAY STHAL ME SAMAGRI AAPURTI KARYA
Secondary Stage Science Kit With Microscope (NCERT) (Q3)
Tentage Service - Clear-Span Tent German Hanger ( Waterproof and Fireproof)
Strengthening of Pucca Structures and banks between Km. 10.000 to 14.800 of M.J.L.C.
Construction of C.R. Stone Masonry Wall in the internal section of Meja Jirgo Link Canal between Km. 26.248 to 28.400
Protective works on both sides of the Super Passage constructed at Km 43.200 of the Meja Jirgo Link Canal, including strengthening of the canal banks.
Protective works on both sides of the Super Passage constructed at Km 42.500 of the Meja Jirgo Link Canal, including strengthening of the right side canal bank
Bank strengthening work on both sides of Meja Jirgo Link Canal between Km. 42.940 to 43.140.