Loading…
Loading…
4 results • Latest
Provn of 03 x (03 seated toilet block) and 03 x (03 seated bath block) alongwith allied services and devp wks for Mon of 27 AR
SCHEDULE 'A' PART-I (Provn of 03 x seated toilet block (Building wk) Earth work in excavation in trenches n'exc 1.5 m wide and n'exc 1.50 mtr in depth for fdn etc and getting out in all kinds of soil).
Provision of various resdl non resdl buildings and infra devp wks for COB Aboi of 12 AR at Nagaland
(COB ABOI) SCHEDULE' A' PART-I (SITE DEVELOPMENT singl Offrs, single JCO accn, Kote & Mag, Store accn and Single Man Bks,) Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. All kinds of soil .
QUICK CHANGE TAPPING CHUCK WITH TANG MODEL NO. QCLK-3 MT4
Description :QUICK CHANGE TAPPING CHUCK WITH TANG MODEL NO. QCLK-3 MT4 [ Warranty Period: 3
SURF WK INCL P/L OF GSB 15 CM TH SAND BLANKETING 10 CM TH WMM 10 CM TH WMM 7.5 CM TH DBM 5 CM TH BC 3 CM TH BERM FILLING AND RD MARKING BET KM 5.90 TO 7.30 AND KM 13.50 TO 17.10 ON RD MON-TANG UNDER 100 RCC/15 BRTF (P) SEWAK IN NAGALAND STATE