Loading…
Loading…
3,087 results • Latest
Patch Repair work on SH MDR ODR Roads under AE-IIIrd
Patch Repair work on Village Roads under AE-IInd
Register (V2) (Q4)
Drainage Improvement in Hapur yard under ADEN/HPU.
Improvement of water supply arrangement, drainage / sewerage system and consequent improvement to colonies quarters at Najibabad and Kotdwar under Sr.DEN/IV/MB.
Construction of new running room for crew and train manager at HW(est. No. 74/2026 CAP)
Provision of high level platform(PF-1) and provision of FOB ramp at Aithal under ADEN/RK (est. No. 85/2026 CAP)
Provision of ramp for existing FOB at Raiwala station on LRJ-DDN section (est. No. 94/2026 CAP)
Construction of holiday home/subordinate ORH at Haridwar and YNRK (est. No. 77/2026 CAP) and Construction of new type-IV qtr for DMO/HW at HW (est. No. 75/2026 CAP)
Heavy repair to Major Br 213 (15x6.1m) downstream cascade and launching apron after 2024 flash floods in HRW_DDN section of ADEN HW (est. No. 97/2026 RRSK)
Provision of high level platforms (PF-2) alongwith ramp for existing FOB at Pathri under ADEN-HW (est. No. 82/2026 CAP)
Provision of ramp for existing FOBat Jwalapur on LRJ-DDN section (est. No. 93/2026 CAP)
Construction of new running room at YNRK (est. No. 76/2026 CAP)
Provision of high level platforms at Motichur station (PF-1&2) alongwith FOM ramp on LRJ-DDN section (est. No. 84/2026 CAP)
TABLE SMALL SIZE L=600MM, W=450MM, H=750MM TABLE SMAL IN IRON FRAME (1" X 1" ) WOODEN TOP WITH SUNMICA WITHOUT DRAWERS. Details specification is enclosed.
New Construction work on Sunari to Imratpur Udho link road
Ujala Dispo-care--M/S UJALA SURGICAL INDUSTRIES Cotton Bandage Cloth , Pack of 1 Brand: Ujala Dispo-care--M/S UJALA SURGICAL INDUSTRIES (Detailed Description/Specification as per Product # 1 of GeM Co
Ward No.04 Construction of CC road and RCC drain from Tube well Boundry to girls Inter college.
Ward No.01/06 Construction of RCC drain from Muskakim house to saifi Ahmad house.
Ward No.13 Construction of RCC drain from Rakesh house to Highway By pass.
Ward No.10 Construction of RCC Nala from Community Health Centre corner to Mombatti wale house.
Ward No.13 Construction of RCC drain from Kalbe Ali house to Highway By Pass.
Ward No.03 Construction of RCC drain from Raza chowk to JLM inter college shamshan ghat.
Ward No.14 Construction of RCC drain from Kallu Lauhar to Karbala Gate.
Ward No.03 Construction of RCC drain from sardar khan plot to Rafi khan plot.
Ward No.14 supply and laying 200mm dia HDPE pipe line from Anvaar Panwadi shop to Karwala and Faraheem Taal to Humsafar Marriage hall.
Ward No.05 supply and laying 200mm dia HDPE pipe line from Tamatar house to Yunus Saifi House.
Ward No.04 supply and laying 110mm dia HDPE pipe line from Rafeek shop to Dr. Jahangeer house, Jameel house to kanya School and istkar house to Master Unais House.
Ward No.05 Construction of CC road and RCC drain from waseem to Navi Hasan Rice Mill.
Ward No.13 Construction of CC road and RCC drain from Haji Chanda to Majarul house rafat to aslam house shareef to sharaf house side link road asif to ikbal house.
Ward No.04 Maintenance of CC road and RCC drain from Braj Kishor house to Amir Ahmad Mombatti Wale house Via Meva Ram house.
Special Repair work on Bilari Darni Road
Ward No.14 Construction of CC road and RCC drain from Kallu Lauhar house to Karwala Gate.
Ward No.14 Construction of CC road and RCC drain from Peth Bazar shop to Faraheem House Corner.
Ward No.03 Construction of CC road and RCC drain from Raja Chauk to shamshan Ghat.
Ward No.14 Construction of CC road and RCC drain from Eheshan Qureshi to Sabbir Gher.
Ward No.05 Construction of CC road and RCC drain from Haneef Lauhar to Rashid Kuraishi.
Ward No.15/04 supply and laying 160mm dia HDPE pipe line from Jameel Mukti house to Manta shah Tube well Via Rayasat house and chak wale Rasta to Kanya Wale Pump.
Ward No.14 supply and laying 110mm dia HDPE pipe line from Sair Hussain to Ashraf house, Ahmad Ali to Haji Zulfiqar house, Karoon to Ahsan house, Moveen to Saleem house and Bhura to Afsar house in Shavab Wale Bag.
Nagar ke Savjanik Isthanoo and Chowk Chowrahooo per 27 pcs India Marka-II Hand Pump Reboor Work.
Ward No.11 Beautificaion of shamshan ( Plaster, Painting, Gate Fixing, Toilet Floor and wall Tilling, C.C Banches, Septic Tank and Interlocking approch road /Pathway in Shamshan)
Construction of 8 seater Toilet Block with 3 Urinal in Play Ground.
Construction of 7 seater Toilet Block with 3 Urinal in Ambedker Park.
Ward 03 mai Dussehra Isthal per Buiding Hall ka Nirman work.
Ward 03 mai Dussehra Isthal per Darshak shed work.
Dushera isthal per 01 pcs water cooler with submersable Pump ka establishment work.
Ward No.03 contruction of CC road and RCC drain from Haji Umar house to Mauseen house and Vaseem house to asif house.
Ward No.08 kayasthan me 01 Digital Study center ka Nirman work.
Ward No.03 me dashara Isthal par Mitti bharan work.
Resurfacing of P/F 4/5 and PF 6 along with coping replacement and making it divyangjan friendly at Shahjahanpur station and Provision of Tactile and divyangjan friendly amenities at PF 4/5 at Hardoi station under Dy CE/GSU/MB