Loading…
Loading…
1,845 results • Latest
Signaling work in connection with interlocking of Level Crossing Gate no. 30, 31, 40 and 42A in East section of Mumbai Division.
Replacement of EI operating panel with VDU at five stations of PNVL-Roha section and other improvemental work in EI installed in East section of Mumbai Division of Central Railway.
Supply, Trenching and Laying of 6 Quad cable along with associated accessories, Jointing, testing & commissioning of complete Quad cable system and laying of HDPE pipe, Blowing, Drawing of OF Cable, splicing and termination of OFC including Supply, installation, testing & commissioning of IP-MPLS network equipment, Telecom assets etc. for unified communication backbone of Indian Railways in connection with New BG line at Lonand-Phaltan- Baramati section in connection with work of "Lonand -Baramati New BG Line." in the Pune division of Central Railway.
Supply, Installation and Commissioning of 2 Ton 5 star Split AC for Ahmedabad Territory
SITC of Fire Fighting Fire Alarm and Detection System for New Terminal Building and New Office Block at Juhu Airport Mumbai
NHMConcurrentAudit2026 2027
NOTICE INVITING SEALED TENDER DOCUMENT FOR SELECTION OF CONTRACTOR FOR RENDERING CANTEEN SERVICES AT CANARA BANK CIRCLE OFFICE PREMISES AT BKC MUMBAI 400051