Loading
Loading…
Loading…
3 results • Latest
Supply, Installation and Commissioning of 02 Nos 30kva UPS along with Battery Bank with additional 03-year CAMC at NTPC NRHQ Lucknow
Augmentation of 66kV substation Partap Steel from (2x 12.5/16) MVA to (1x25/31 .5 plus 1x 12.5/16) MVA, 66/11 kV T/Fs atong with replacement of existing 11kV Panel Set with new matching capacity 11kV panel set
Selection of SI cum DCO for Operation and Maintenance of UP State Data Centre.