Loading…
Loading…
27 live19 closing this weekmost from Department Of Defence and EIC-CIVIL
27 results • Latest
Construction of H.L Bridge over Local Nallah at 2.600 Km on Nabarangpur to Ambadola Road in the District of Nabarangpur under SBY for the year 2024-25.
Catering Service per Packet based - Non-Veg; Snacks/High; Buffet(Breakfast/Lunch/Dinner)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2)
Hiring of Sanitation Service - Manpower Based Model - Sweeper; 7; Indoor Area; Common Area, Staircase, Pantry Cafeteria, Basement/Parking Lots/Service Areas, Restrooms; Daily; 2
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; Deep Cleaning; Indoor, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; Deep Cleaning; Outdoor, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Outdoor
Entry and Mid Level Desktop Computer (Q2), Line Interactive UPS with AVR (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Scanner (V3) (Q2), A3 Size Multifunction Printer (MFP) (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), Computer Printer (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Fllod Damage Repair (FDR) to Nabarangpur Rajoda Kosagumuda road at ch 13 /700 Km to ch 14/000 in the district of Nabarangpur for the year 2026 27
Flood Damage Repair (FDR) to Construction of Protection wall at Nabarangpur Digisalapa Dahana road at Ch 15/250 Km RHS for the year 2026 27
INTERMEDIATE BULK WATER CONTAINERS
Civil works (Building)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) ( ( 3 3 ))
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) ( ( 3 3 ))
Pants (Q3), Mens Casual Shirt (Q3), Kurtis and Kurta Sets - Handicraft (Q3), shoes school pvc boys girls (Q3) (3 (3 ))
Pants (Q3), Mens Casual Shirt (Q3), Kurtis and Kurta Sets - Handicraft (Q3), shoes school pvc boys girls (Q3) (3 (3 ))
Construction of panel room and watchman shed at Intake well near Indrabati river under Nabarangpur Municipality
Supply, Installation and Commissioning of 40HP VT pump set and VFD Panel board and other ancillary work at intake well near Indrabati River at Nabarangpur
Construction of H.L Bridge over Local Nallah on RD road to Dengaguda road in the district of Nabarangpur under SBY for the year 2024-25.
Construction of H.L. bridge over Local Nallah at 0.450 Km on Bariguda to Jharanaguda road in the District of Nabarangpur under SBY for the year 2025-26.
Independent Engineer Services during Operation n Maintenance Period for 6 Laning of Kaliagura to Baunsagar (OD 5) and Baunsagar to baraja of NH 130 CD Raipur Vishakapatnam economic corridor on HAM in the state of Odisha
SETTING UP OF 49.5 MW WIND POWER PROJECT AT PAPADAHANDI, ODISHA WITH O&M for 10 yrs
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode