SCVP PROJECT NANDED | Nanded, Maharashtra·6d agoPublished 17 Aug 2026
Development, Operation, Maintenance and Management of a 14.3 MW Ground Mounted PV Battery Energy Storage System 14.3 MW GPV BESS Integration at the Shankarraoji Chavan Vishnupuri Project a Public Private Partnership PPP basis
Babhali High Level Barrage Tq.Dharmabad Dist. Nand | Nanded, Maharashtra·6d agoPublished 17 Aug 2026
Dismantling and Replacement of Damaged Side an Bottom Rubber Seals of 15 Gates with Double Bulb TeflonCladded Side Seals and Flat Type Bottom Seal as per IS 11855 1986 including Sundry material,Labour and transportation charge
Various Types of Repair Work of Flow guide wall service gates of size 3.15x1.25m including 1 repair of track rollers 2 replacement of side,bottom and top rubber seal 3) repair to EOT crane of 23 MT capacity to be Performed At Shankarrao Chavhan Vis